16
Step 5 — Field Fabricate Ductwork
—
Cabinet return-
air static pressure (a negative condition) shall not exceed 0.5 in.
wg (87 Pa) with economizer or without economizer.
For vertical ducted applications, secure all ducts to roof curb
and building structure. Do not connect ductwork to unit.
Fabricate supply ductwork so that the cross sectional dimen-
sions are equal to or greater than the unit supply duct opening di-
mensions for the first 18 in. (458 mm) of duct length from the
unit basepan.
Insulate and weatherproof all external ductwork, joints, and
roof openings with counter flashing and mastic in accordance
with applicable codes.
Ducts passing through unconditioned spaces must be insulat-
ed and covered with a vapor barrier.
If a plenum return is used on a vertical unit, the return should
be ducted through the roof deck to comply with applicable fire
codes.
A minimum clearance is not required around ductwork.
Step 6 — Rig and Place Unit —
Keep unit upright and do
not drop. Spreader bars are not required if top crating is left on
the unit. Rollers may be used to move unit across a roof. Level
by using unit frame as a reference. See Table 1 and Fig. 11 for
additional information.
Lifting holes are provided in base rails as shown in Fig. 11.
Refer to rigging instructions on the unit.
Before setting the unit onto the curb, recheck gasketing on
curb.
POSITIONING ON CURB —
Position unit on roof curb so
that the following clearances are maintained:
1
/
4
in. (6 mm) clear-
ance between the roof curb and the base rail inside the right and
left,
1
/
2
in. (12 mm) clearance between the roof curb and the base
rail inside the front and back. This will result in the distance be-
tween the roof curb and the base rail inside on the condenser end
of the unit being approximately equal to Details A and B in
Fig. 8-10.
Do not attempt to slide unit on curb after unit is set. Doing so
will result in damage to the roof curb seal.
Although unit is weatherproof, guard against water from
higher level runoff and overhangs.
Flue vent discharge must have a minimum horizontal clear-
ance of 48 in. (1220 mm) from electric and gas meters, gas regu-
lators, and gas relief equipment. Minimum distance between unit
and other electrically live parts is 48 in. (1220 mm).
Flue gas can deteriorate building materials. Orient unit such
that flue gas will not affect building materials. Locate mechani-
cal draft system flue assembly at least 48 in. (1220 mm) from an
adjacent building or combustible material.
After unit is in position, remove rigging skids and shipping
materials.
Fig. 11 — Rigging Details
CAUTION
Failure to follow this caution may result in damage to roof-
ing materials.
Membrane roofs can be cut by sharp sheet metal edges. Be
careful when placing any sheet metal parts on such roof.
CAUTION
Failure to follow this caution may result in equipment dam-
age.
All panels must be in place when rigging. Unit is not
designed for handling by fork truck when packaging is
removed.
NOTES:
1. Dimensions in ( ) are in inches.
2. Hook rigging shackles through holes in base rail, as shown in detail “A.” Holes in base rails are centered around the unit center of gravity.
3. Use wooden top skid, when rigging, to prevent rigging straps from damaging the unit.
UNIT
MAX WEIGHT
DIMENSIONS
A
B
C
LB
KG
in.
mm
in.
mm
in.
mm
580J*17
2355
1068
127.8
3249
58.7
1491
52.3
1328
580J*20
2370
1075
127.8
3249
58.7
1491
52.3
1328
580J*24
2516
1141
141.5
3595
71.5
1816
52.3
1328
580J*28
2652
1203
141.5
3595
71.5
1816
60.3
1532
580J*30
2976
1353
157.8
4007
80.3
2040
60.3
1532
"B"
"C"
"A"
"914-1371"
(36"-54")
DETAIL A
SEE DETAIL A
PLACE ALL SEAL STRIP
IN PLACE BEFORE PLACING
UNIT ON ROOF CURB.
DUCT END
Summary of Contents for LEGACY 580J*20M Series
Page 4: ...4 Fig 2 Unit Dimensional Drawing 17 and 20 Size Unit...
Page 5: ...5 Fig 2 Unit Dimensional Drawing 17 and 20 Size Unit cont...
Page 6: ...6 Fig 3 Unit Dimensional Drawing 24 and 28 Size Unit...
Page 7: ...7 Fig 3 Unit Dimensional Drawing 24 and 28 Size Unit cont...
Page 8: ...8 Fig 4 Unit Dimensional Drawing 30 Size Unit...
Page 9: ...9 Fig 4 Unit Dimensional Drawing 30 Size Unit cont...
Page 13: ...13 Fig 8 Roof Curb Details 17 and 20 Size Units 17 20...
Page 14: ...14 Fig 9 Roof Curb Details 24 and 28 Size Units 24 28...
Page 15: ...15 Fig 10 Roof Curb Details 30 Size Units 30...
Page 25: ...25 Fig 33 Typical Perfect Humidity Adaptive Dehumidification System Humidistat Wiring...
Page 40: ...40 Fig 41 Typical RTU Open System Control Wiring Diagram...
Page 41: ...41 Fig 42 Typical RTU Open System Control Wiring Diagram with Perfect Humidity System...