37
START--UP CHECKLIST
(Remove and Store in Job Files)
I. PRELIMINARY INFORMATION
MODEL NO.:
SERIAL NO.:
DATE:
TECHNICIAN:
II. PRESTART--UP (Insert check mark in box as each item is completed)
( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT
( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS
( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS
( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE
( ) VERIFY THAT UNIT INSTALLATION IS LEVEL
( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESS
III. START--UP
ELECTRICAL
SUPPLY VOLTAGE
COMPRESSOR AMPS
INDOOR (EVAPORATOR) FAN AMPS
TEMPERATURES
OUTDOOR (CONDENSER) AIR TEMPERATURE
DB
RETURN--AIR TEMPERATURE
DB
WB
COOLING SUPPLY AIR
DB
WB
HEAT PUMP SUPPLY AIR
ELECTRIC HEAT SUPPLY AIR
PRESSURES
REFRIGERANT SUCTION
PSIG, SUCTION LINE TEMP*
REFRIGERANT DISCHARGE
PSIG, LIQUID TEMP
{
( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS
* Measured at suction inlet to compressor
{
Measured at liquid line leaving condenser.
My Learning Center is your central location for professional residential HVAC training resources that help strengthen careers and businesses.
We believe in providing high quality learning experiences both online and in the classroom.
Access My Learning Center with your HVACpartners credentials at www.MLCtraining.com. Please contact us at [email protected] with
questions.
607E
Summary of Contents for 607E Series
Page 3: ...3 A180109 Fig 2 607E C24 30 Unit Dimensions 607E...
Page 4: ...4 A13175 Fig 3 607E A36 60 Unit Dimensions 607E...
Page 27: ...27 A13146 Fig 17 Connection Wiring Diagram 208 230 3 60 607E...
Page 28: ...28 A13147 Fig 17 Cont Ladder Wiring Diagram 208 230 3 60 607E...
Page 29: ...29 A13148 Fig 18 Connection Wiring Diagram 460 3 60 607E...
Page 30: ...30 A13149 Fig 18 Cont Ladder Wiring Diagram 460 3 60 607E...
Page 31: ...31 A170012 Fig 19 Cooling Charging Chart 607E...