
Form: 2405
Universal Communication Gateway Reference Manual
Date: 01-25-2019
Revision: 8
Bryan Steam LLC, 783 North Chili Avenue, Peru, IN 46970
Web:
Phone:
765.473.6651
Fax:
765.473.3074
E-mail:
7
1
HOW TO USE THIS
MANUAL
This manual may be used in its entirety or
as a reference.
You may need to reference
your device’s manual for information not
covered in this UCG manual
. The three
main sections are as follows:
Mounting UCG
– This section
is for mounting the UCG control panel,
connecting power and building
management connections.
Connect and Setup for Boiler
Devices to the UCG
– This section is for the
connections and set-up of each device for
the Modbus communication to the UCG.
Setup for UCG
– The section is
for the set-up of the UCG to communicate
to the devices (Modbus) and to your
building management system.
All other sections are supportive of the
sections above.
2
MOUNTING UCG
2.1
MOUNTING
Mount the UCG in a suitable location that is
easy to access. Verify that the UCG power
switch is in the “off” position. Connect J1-
1(L1), J1-2(L2) and J1-3(G) of the UCG-PCB
WD-856 to a 120VAC power source.
120V
FROM
SEPARATE
POWER
SUPPLY
G
L1
L2
L2
1
2
3
Figure 2 - Power Connection
2.2
BUILDING MANAGEMENT
SYSTEM (BMS) WIRING
Building Management wiring is determined
by the protocol of the BMS.
MODBUS TCP/IP and BACnet/IP
see
BACNET MS/TP and METYASYS N2
see
LONWORKS
see
2.2.1
MODBUS TCP/IP AND
BACNET/IP
Use Cat5 cable to connect the field BMS
computer to the UCG via the Ethernet
(RJ45) connection of the ProtoNode inside
the UCG. See Figure 3. After BMS
Figure 3 - Ethernet Connection on the ProtoNode