Disassembly

1. RV Series boiler shown.

This is KD-4 condition as
the boiler is delivered to the
job site.

2. After unbolting clips remove

burner.

3. Remove control devices,

gauges and valves, jacket
access doors and panels.
Jacket panels are fastened
with single screws.

4. Flanges are color coded

with their mates to make
correct reassembly easy.
White stripes guide accu-
rate realignment.

5. Jacket frames are tack

welded and coded for easy
reassembly. Break tack
welds and remove frame.

6. Remove tube panels (secured

by bolts and angles) tube
clamps, and back flue panel
(tack welded).

7. Remove baffles and with tube

puller furnished, remove
tubes. Remove flue collector
end panels.

8. Remove bolts holding up-

per tube header and remove
pressure vessel assembly
using permanent lift lugs on
the assembly.

Reassembly

9. Transport components

through doors to boiler site
for reassembly. Install
monoblock insulation in floor
frame, mix cement reinforced
with stainless steel needles,
pour refractory base in floor
frame.

10. Matching flange colors reas-

semble pressure vessel. Pre-
pare tube holes and install
tubes.

11. Install tube clamps. Install flue

collector panels, position
tube panel frame and weld
into place.

12. Insert baffles and install flue

collector back and side
panels. Install flue collector
top. Install tube panels.

13. Seal weld entire flue collec-

tor to prevent flue gas leaks.
Reassemble jacket frame-
work following color codes
and aligning tack welds, then
weld into place.

14. Apply insulation all around

and secure.

15. Attach jacket panels to frame-

work.

16. Install burner, pack around

head with ceramic blanket.

17. Install control devices using

pre-drilled holes and outlet
openings. Install control
panel.

18. Wire controls into burner

panel.

Step-by-step
how to do it

16

10

11

12

8

9

7

4

5

6

3

1

2

17

18

13

14

15

Summary of Contents for Bryan Knockdown CLM-120 29

Page 1: ...700 Rev 2 04 Featuring the exclusive Bryan Flexible Water Tube design Bryan Knockdown Boilers for easy field replacement Hot Water Heating and Steam Boilers 1 200 000 BTUH to 8 000 000 BTUH 29 BHP to 191 BHP TM ...

Page 2: ...esigns and an absolute mini mum area is needed to service water tubes A variety of knockdown stagesSeveralstatesofpartial to complete assembly are available depending on boiler size and on site considerations Consult your Bryan Boilers Representative to select the configuration best suitedtoyourparticularrequire ments These are KD 1 Boiler is shipped com pletely assembled ready for knockdown singl...

Page 3: ...embly Reassembly 9 Transport components through doors to boiler site for reassembly Install monoblockinsulationinfloor frame mixcementreinforced with stainless steel needles pour refractory base in floor frame 10 Matching flange colors reas semblepressurevessel Pre pare tube holes and install tubes 11 Installtubeclamps Installflue collector panels position tube panel frame and weld into place 12 I...

Page 4: ...0 1640 RV 700 167 194x24x35 1920 226x55x20 2220 194x13x21 1150 226x50x20 1890 RV 800 191 216x24x35 2110 249x55x20 2530 216x13x21 1260 249x50x20 2020 Includes Channel Iron Base Select the Knockdown TM solution for your replacement problem Dimensions and Weight for RV Series Knockdown Construction in Inches and Pounds Form No 7700 1998 Bryan Steam LLC Printed in USA 24 5619 Specifications subject to...

Reviews: