background image

PAGE 6

BRUNSWICK INSTALLATION MANUAL

SLATE ASSEMBLY AND LEVELING
(CONTINUED)

FIGURE  THREE

Step #8: 

 With a precision level, level each end slate

section by driving wooden slate wedges (provided)
between the top of the baseframe and  bottom of the
slate.  Keep the wedges as close to the countersunk
holes as possible.

Step #

9:

  With both end slates perfectly level, continue

fastening the end slates at the joints.  Recheck for
levelness and if necessary, back the screws out and
adjust the shim position, then retighten the slate
attaching screws.

Step #10:

  When satised that both end slates are level,

shim the center slate section as required to obtain a
ush t at both joints, then screw the center slate down.

FIGURE THREE

FIGURE FOUR

Step #11:

  Slate joints can now be lled with fast setting

rock hard putty.  Lightly sand or scrape across joint after
grouting.

Step #12:

  From the end of a bed cloth, cut strips of cloth

approximately 1-1/2" wide by approximately 8" long and
glue the strips to the pocket cutouts (3m Super 77 is
recommended for this step).  This is important as this
will provide cushioning from ball impact and the bed
cloth will last much longer.

FIGURE FOUR

SLATE

WEDGE

SILL

CLOTH

STRIP

OAKLAND II

Summary of Contents for Oakland II

Page 1: ...1 906253 000 OCTOBER 2016 TM Oakland II POCKET BILLIARD TABLE INSTALLATION MANUAL www brunswickbilliards com SERVICE DEPARTMENT P O BOX 68 BRISTOL WI 53104 EMAIL BRUNSWICKSERVICE BRUNSWICKBILLIADS COM...

Page 2: ...AKLAND II NOTE Please use the instructions in this manual to assemble the table shown below Illustrations may differ depending on the table being assembled Also note that careful handling of all compo...

Page 3: ...t 3 8 16 x 3 hex head cap screw with 3 8 washer inside the leg projecting to the outside FIGURE ONE FIGURE TWO Step 2 Place end sill into position by sliding the hex head screws through the clearance...

Page 4: ...om walls or obstructions Step 7 Square the table by measuring diagonally adjust if necessary by pushing at the of the baseframe diago nally until measurements are within 1 8 Step 8 Tighten all hardwar...

Page 5: ...on of slate on the table Be sure that the center section is precisely square with the frame and an equal amount of overhang exists on both sides of the table FIGURE ONE FIGURE TWO Step 4 Position the...

Page 6: ...retighten the slate attaching screws Step 10 When satis ed that both end slates are level shim the center slate section as required to obtain a ush t at both joints then screw the center slate down FI...

Page 7: ...e Hold the can approximately 4 8 from the area to be coated Coat the underside of the slate also Place a piece of protective paper or card board on the top surface of the cloth CAUTION Do not allow an...

Page 8: ...tely 2 apart Step 4 Stretch the cloth across the table and tack or staple securely at 2 with two tacks or staples 2 apart FIGURE ONE FIGURE TWO Step 5 Stretch the cloth from 1 to 3 and tack or staple...

Page 9: ...securely along the wood slate frame FIGURE SIX Step 17 Tack or staple all of the left side on 2 centers keeping the cloth even along the wood frame Step 18 Tack or staple the balance of the head end o...

Page 10: ...rail as shown Press in tightly against the end on the rail while threading a 5 16 18 x 1 hex head bolt with washer into the threaded hole in the stud Tighten securely Step 3 Repeat above procedure wi...

Page 11: ...e apron with 8 x 1 2 pan head screws FIGURE TWO FIGURE THREE Step 3 Align the eighteen machine studs with the eighteen clearance through the slate and lower the assembly onto the slate Step 4 Thread t...

Reviews: