12
MAXI assembly
instructions
Step 1
Step 2
BRULA dipping cement is applied to all the surfaces of the firebox
components (except the base stone).
Caution: Place the calcium silicate tape in the gaps between
the ceramic components and the platform/door to
enable optimal elongation.
Loosely suspend the retaining clips
and insert the top plate stones.
Step 3
Step 4
Step 5
Caution! Adhesive grout it applied to the front.
A space of 0.5 - 1 cm is left between the firebox and cladding.
The front elements are only adhered to the mantel stone with adhesive
grout.