Bruker Daltonik GmbH
Installation and Setup
2.3 Setup
To setup the instrument:
1. At the rear of the instrument, plug in the following cord and cables into the
corresponding connections (Figure 3-3.
a. Line cord.
b. Remote cable.
c. Signal
cables.
2. Plug the other end of the AC line cord into a suitable AC outlet.
Caution:
Read and follow all electrical and safety precautions described in
chapter 1.3 Safety or chapter 1.3 Safety.
3. Plug the data system end of the signal cable connections into the appropriate
connections (Figure 2-1).
4. Plug the data system end of the Remote cable into the COM-1 port on the PC.
5. Turn on the AC mains switch.
6. Ensure that the POWER LED is illuminated (Figure 3-2).
After initial power-up it may be as long as 12 hours before the instrument is ready for
operation, at which time the Ready
LED illuminates (Figure 3-2).
Note:
If any faults occur within the system the Error
LED (Figure 3-2) illuminates and
the system goes into standby. Contact your authorized service personnel for
help.
ultraflex III User Manual, Version 1.0
17