Preparation
26
Z33119_2_003
Release and remove the transport safety
lock, which are the two butterfly nuts at the
bottom of the BCU I housing (1).
Position the BCU I taking the magnetic fringe field into account.
• For Ascend™ (all frequencies) and all other magnets ≤ 700MHz: Place the BCU I
outside 0.5mT (5 G) and not less than 1m from the axis of the magnet.
• For magnets ≥ 750MHz: Place the BCU I outside the 5mT (50 G) and not less than
2.7m from the axis of the magnet.
Unscrew and remove the white protective
cover (1) at the end of the transfer line
before pressurizing the BCU I with VT gas
(max 6 bar).
Install the support clamp (Z53660) to the
magnet flange.
Assemble and install the transfer line
support BSCU support (Z119100) for
systems with a transfer line >2m.
Summary of Contents for SmartCooler BCU I
Page 1: ...SmartCooler BCU I User Manual Version 003 Innovation with Integrity NMR...
Page 12: ...Safety 12 Z33119_2_003...
Page 18: ...Introduction 18 Z33119_2_003...
Page 28: ...Preparation 28 Z33119_2_003...
Page 30: ...Installation 30 Z33119_2_003...
Page 42: ...Troubleshooting 42 Z33119_1_003...
Page 44: ...Replacement of Parts 44 Z33119_2_003...
Page 48: ...Contact 48 Z33119_2_003...
Page 49: ...Z33119_2_003 49...
Page 50: ...Bruker Corporation info bruker com www bruker com Order No Z33119...