Installation Schedule
Site Planning Information BioSpec 70/30 USR_2_V020
23
4
Installation Schedule
4.1
Installation planning overview
Planning for a BioSpec® installation comprises the following subject areas:
• Characterization the planned installation site in terms of its suitability for MR
• Planning the laboratory structure and operational procedures
• Planning the structure of rooms and buildings
• Planning electronics and cable trays
• Planning air conditioning, water supply and room ventilation
• Planning safety devices
The main components of an installation should be included in the following rooms:
• Air-conditioned and sound-proofed magnet room, potentially with RF shielding
• Temperized technical room for the MR system's electronics
• Operating area and animal preparation area
Figure 4.1: Installation planning overview
1
Magnet room
4
Power distribution panel
2
Operating area
5
Exhaust line and vent
3
Preparation area
6
Technical room
Summary of Contents for BioSpec 70/30 USR V2
Page 6: ...Contents vi Site Planning Information BioSpec 70 30 USR_2_V020...
Page 20: ...Safety 20 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 88: ...Moving or Dismantling the MR Instrument 88 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 98: ...Tables 98 Site Planning Information BioSpec 70 30 USR_2_V020...
Page 103: ...Site Planning Information BioSpec 70 30 USR_2_V020 103...