Installation and Operation of the CHC plus Humidity Chamber
DOC-M88-EXX268_V1_12.2016
61
ter supply line voltage. Steps for doing this are given in section
. The steps for the software integration of the controllers are given in sec-
of the Appendix.
The Julabo water circuit must always stand outside the diffractometer enclosure close to
the diffractometer on the back right side.
Figure 7.2: Front view of TCU110
Figure 7.3: Front view of a CCU100 Controller
Figure 7.4: Front view of MHG controller
Summary of Contents for Anton Paar
Page 6: ...Contents 6 DOC M88 EXX268_V1_12 2016 ...
Page 12: ...List of Figures 12 DOC M88 EXX268_V1_12 2016 ...
Page 26: ...General Remarks 26 DOC M88 EXX268_V1_12 2016 ...
Page 34: ...Vacuum Equipment 34 DOC M88 EXX268_V1_12 2016 ...
Page 135: ...DOC M88 EXX268_V1_12 2016 135 ...
Page 136: ...Bruker Corporation info baxs bruker com www bruker com Order No DOC M88 EXX268 ...