background image

 

 

 

 

 

MAINTENANCE 

 

 

Pump Head Maintenance  

Pump Head Assembly 

Step 1:  

Ensure all parts are clean and free from damage (see Inspection section). Lubricate all O-rings 

with petroleum based lubricant; lubricate packing and plunger with a  suitable packing lubricant grease 
(Teflon or Graphite based packing lubricant is recommended, but an equivalent suitable lubricant like a 
Molybdenum disulfide based lubricant can be substituted). 

 

Step 2:

  Install O-ring into bottom seat. Place the 1/2” ball into bottom seat 

and the gasket (the widest of the four gaskets) onto the seat and cover ball 
with ball cage. Place gasket onto ball cage and insert into suction end of body. 
Thread bottom bushing into suction end of body utilizing a thread sealant. 
Tighten bottom bushing. 
 

Step 3:

  Install O-ring and retaining ring into the top seat. Install top seat into 

body with a gasket on both sides of seat. Place 3/8” ball and ball check spring 
into top bushing. Thread top bushing into body utilizing a thread sealant. 
Tighten top bushing. 
 

Step 4:

  Install packing with lantern ring in body, ensuring it is installed in the 

correct order and orientation. 

Note: The “V-Ring” point should be pointing 

outward and the lantern ring in line with the grease jack. 

Place plunger 

packing gland on packing. Loosely thread packing gland nut into the body. 
Carefully insert plunger into packing. Install grease jack lubricating assembly 
onto pump head. 
 

Step 5:

  Install head assembly into housing, ensuring plunger fits into the 

crosshead assembly and install drive clip. Install and tighten hex bolts.   
 

Step 6:

  Install gasket and cover with wing screws. Install and tighten priming 

valve into body utilizing a thread sealant. 
 

Pump Head Disassembly 

Step 1: 

 Disconnect power source, ensure all pressure is removed from pump head assembly and isolate 

fluid discharge and suction lines. Open and remove priming valve. Disconnect fluid discharge 
and suction lines.  

Step 2:

  Remove the cover, to get access to and remove drive clip from the crosshead assembly. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BR2400 

Electric Drive Chemical Injection Pump 

Disconnect  power  source  and  ensure  pressure  is  removed  from  pump  head  prior  to                                      
performing  any  maintenance.  Hazardous  pressures  can  result  in  serious  injury  or 
property damage. 

 

Maintenance 

and Inspection 

04-21 

Reviews: