195
OILING SYSTEM
OILING SYSTEM TESTS
9
OILING SYSTEM TESTS
IMPORTANT:
Always perform visual inspec-
tions to identify oiling system leaks. Make sure the
oil tank is filled and oil supply is not contaminated.
Oil Injection Pump Static Test
IMPORTANT:
Static tests are performed with
the outboard not running.
Use
Evinrude Diagnostics
software to activate the
Oil Injector
test. This test starts the
EMM
control
function for the oil injection pump.
The
EMM
controls the pump by providing ground
through pin 23 (blue wire) of the J1-B connector
and pin 2 (blue wire) of the oil tank connector.
IMPORTANT:
This test is operating the pump
with 30 V on the system voltage (55 V) circuit. The
start assist circuit (SAC) of the
EMM
converts bat-
tery voltage (12 V) to 30 V of system voltage. Bat-
tery must be fully charged and connections must
be clean and tight. Pump activation should be
carefully confirmed.
Use an inductive timing light to monitor current
flow through the ground circuit (blue wire) at the
oil tank connector (pin 2).
If the light flashes, the
EMM
and oil injection cir-
cuits are not at fault.
Refer to
Oil Injection Pump Voltage Test
Oil Injection Pump Voltage Test
Check voltage at pin 1 (white/red wire) of oil tank
electrical connector.
Acceptable voltage readings:
•
Key switch ON: approximately 30 V
•
Outboard running: 55 V
Results:
•
If voltage is not within range, refer to
tion Pump Circuit Resistance Test
•
No voltage reading, refer to
Monitor the voltage on the oil injector circuit at
pin 2 (blue wire) of oil tank connector with out-
board running at 1500 RPM.
Use an appropriate test probe and a digital multi-
meter calibrated to a scale that reads 55 V (DC).
Connect positive meter lead to pin 2 and negative
meter lead to ground.
Voltage reading should be approximately 55 V,
and drop approximately 5 V as
EMM
actuates oil
injection pump.
Static Tests Screen
006813
1.
Oil injection pump connector (pin 2)
004344
1
Summary of Contents for E250DHLSCS
Page 1: ......
Page 2: ......
Page 191: ...OILING SYSTEM OIL SUPPLY DIAGRAMS V6 189 9 006870 Rear View 6 4 5 3 Top View 1 2...
Page 216: ...214 POWERHEAD SERVICE CHART Taper Pin Tool Hole for Storage Scale FULL SIZE...
Page 242: ...240 POWERHEAD POWERHEAD VIEWS POWERHEAD VIEWS Port Hose Routings 006972...
Page 243: ...POWERHEAD POWERHEAD VIEWS 241 11 Starboard Hose Routings 006952...
Page 244: ...242 POWERHEAD POWERHEAD VIEWS Port 006993...
Page 245: ...POWERHEAD POWERHEAD VIEWS 243 11 Starboard 006973...
Page 246: ...244 POWERHEAD POWERHEAD VIEWS Front 006974...
Page 247: ...POWERHEAD POWERHEAD VIEWS 245 11 Rear 006975...
Page 248: ...246 POWERHEAD POWERHEAD VIEWS Top 006957...
Page 252: ...250 MIDSECTION SERVICE CHART 004117...
Page 348: ...S 2...
Page 380: ......
Page 389: ......
Page 396: ......