SL-1110
5. INSTALLATION
3
5. INSTALLATION
CAUTION
Machine installation should only be carried out by a
qualified technician.
Contact your Brother dealer or a qualified electrician
for any electrical work that may need to be done.
The sewing machine weighs approximately 30 kg.
The installation should be carried out by two or more
people.
Secure the table so that it will not move when tilting
back the machine head. If the table moves, it may
crush your feet or cause other injuries.
Do not connect the power cord until installation is
complete. The machine may operate if the treadle is
depressed by mistake, which could result in injury.
Be sure to connect the ground. If the ground
connection is not secure, you run a high risk of
receiving a serious electric shock, and problems
with correct operation may also occur.
Install the belt cover to the machine head.
5-1. Installation
1. Oil pan
(1) Head cushions (left) [2 pcs]
(2) Head cushions (right) [2 pcs]
(3) Oil pan
(4) Magnet
2. Rubber cushions
(1) Rubber cushions [2 pcs]
(2) Nails [4 pcs]
3. Knee lifter complying bar
(3) Knee lifter complying bar
3830M
4065M
Left side: White
Operator
Right side: Black