3 - 27
Power unit
Main unit
Assembly
3
Power PCB assembly attachment
1. Temporarily tighten the 3 screws
1
in the attachment holes on the PCB
holder at the bottom of the base frame.
2. Run the PCB holder final assembly's lead wire and the power supply's lead
wire through the 2 cord holes
1
on the base frame, and route them along
the upper section of the base frame so that the PCB holder final assembly is
aligned with the 3 screws
1
, and attach it to the base frame.
3. Firmly tighten the 3 screws
1
.
1
Torque
1.18 – 1.57 N-m
1
1
1
Screw, Pan (S/P washer)
M
4X8DB
Summary of Contents for PR-600II
Page 1: ......
Page 2: ......
Page 20: ...2 2 Main parts Main unit ...
Page 33: ...2 15 Disassembly Feed unit Main unit ...
Page 44: ...2 26 Needle thread unit Main unit ...
Page 47: ...2 29 Disassembly Needle bar change unit Main unit ...
Page 50: ...2 32 Thread wiper unit Main unit ...
Page 54: ...2 36 Needle bar unit Main unit ...
Page 60: ...2 42 Upper shaft unit Main unit ...
Page 70: ...2 52 Lower shaft unit Main unit ...
Page 73: ...2 55 Disassembly Power unit Main unit ...
Page 78: ...2 60 Thread cut unit Main unit ...
Page 82: ...2 64 Thread tension unit Main unit ...
Page 91: ...2 73 Disassembly Operation panel Main unit ...
Page 98: ...2 80 ...
Page 100: ...3 2 Operation panel Main unit ...
Page 108: ...3 10 Thread tension unit Main unit ...
Page 118: ...3 20 Thread cut unit Main unit ...
Page 122: ...3 24 Power unit Main unit ...
Page 128: ...3 30 Lower shaft unit Main unit ...
Page 132: ...3 34 Upper shaft unit Main unit ...
Page 147: ...3 49 Assembly Needle bar unit Main unit ...
Page 157: ...3 59 Assembly Thread wiper unit Main unit ...
Page 162: ...3 64 Needle bar change unit Main unit ...
Page 166: ...3 68 Needle thread unit Main unit ...
Page 170: ...3 72 Feed unit Main unit ...
Page 188: ...3 90 Main unit Main unit ...
Page 282: ...4 42 ...
Page 311: ...6 1 6Maintenance ...
Page 333: ......