2 - 30
Basics of Assembly
Main parts
1
Attachment of Front cover assy
1. Lower the presser lever
1
.
2. Connect the connectors of the SSVR PCB assy.
2
and the operation PCB
sub assy.
3
to the main PCB assy.
4
, and hang the lead wire on the guide
part of the shutter cover
5
.
*Key point
• Refer to "Special Instructions of Wiring".
3. Set the front cover assy. to the rear cover assy., and then secure them with
the screw
1
(from the front cover side) and the 2 screws
2
, the 5 screws
3
and the screw
4
(from the rear cover side).
→
Refer to 3 - 47 "Assembly of Front cover assy".
1
Torque
0.78 – 1.18 N·m
2
Torque
0.78 – 1.18 N·m
3
Torque
1.18 – 1.57 N·m
4
Torque
0.78 – 1.18 N·m
2
4
3
2
5
1
4
3
1
Giza Tite
M4X12
Giza Tite
M4X25
Giza Tite
M5X18
Screw, Pan (S/P washer)
M4X8
Summary of Contents for CE-8080PRW
Page 1: ......
Page 2: ......
Page 3: ......
Page 17: ...2 2 Main parts Main parts location diagram BasicsofDisassembly ...
Page 27: ...2 12 Feed mechanism Feed mechanism location diagram BasicsofDisassembly ...
Page 29: ...2 14 Bobbin winder mechanism Bobbin winder mechanism location diagram BasicsofDisassembly ...
Page 31: ...2 16 Bobbin winder mechanism Bobbin winder mechanism location diagram BasicsofAssembly ...
Page 33: ...2 18 Feed mechanism Feed mechanism location diagram BasicsofAssembly ...
Page 44: ...2 29 Basics Main parts Main parts location diagram BasicsofAssembly ...
Page 49: ...3 2 Main parts Main parts location diagram ApplicationofDisassembly ...
Page 89: ...3 42 Main parts Main parts location diagram ApplicationofAssembly ...
Page 111: ...3 64 Bobbin winder mechanism Bobbin winder mechanism location diagram ApplicationofAssembly ...
Page 113: ...3 66 Feed and rotary module Feed and rotary module location diagram ApplicationofAssembly ...
Page 127: ...3 80 Needle presser module Needle presser module location diagram ApplicationofAssembly ...
Page 196: ......