3 - 81
Needle-presser module
Application of Assembly
Application
1
Attachment of Shaft bushing
1. Set the shaft bushing
1
to the base holder assy. with the 2 screws
1
.
1
Torque
0.78 – 1.18 N·m
1
1
Screw, Bind
M
3X6
2
Attachment of Lock nut
1. Attach the lock nut
1
with the screw
1
.
*Key point
• Tighten the lock nut
1
to about half of the screw
1
.
2. Attach the screw
1
to the base holder assy..
*Key point
• Tighten it until the lock nut
1
hit the base holder assy..
• Refer to "4-18 Adjustment : Needle and presser foot front/back
1
Torque
0.39 – 0.49 N·m
1
1
1
1
Set Screw, Socket (CP)
M4X12
3
Attachment of Z pulse motor
1. Attach the Z pulse motor
1
to the base holder assy. with the 2 screws
1
.
2. Attach the lead wire sub assy.
2
to the Z pulse motor
1
.
1
Torque
0.78 – 1.18 N·m
2
1
1
Screw, Bind
M
3X6
Summary of Contents for CE-8080PRW
Page 1: ......
Page 2: ......
Page 3: ......
Page 17: ...2 2 Main parts Main parts location diagram BasicsofDisassembly ...
Page 27: ...2 12 Feed mechanism Feed mechanism location diagram BasicsofDisassembly ...
Page 29: ...2 14 Bobbin winder mechanism Bobbin winder mechanism location diagram BasicsofDisassembly ...
Page 31: ...2 16 Bobbin winder mechanism Bobbin winder mechanism location diagram BasicsofAssembly ...
Page 33: ...2 18 Feed mechanism Feed mechanism location diagram BasicsofAssembly ...
Page 44: ...2 29 Basics Main parts Main parts location diagram BasicsofAssembly ...
Page 49: ...3 2 Main parts Main parts location diagram ApplicationofDisassembly ...
Page 89: ...3 42 Main parts Main parts location diagram ApplicationofAssembly ...
Page 111: ...3 64 Bobbin winder mechanism Bobbin winder mechanism location diagram ApplicationofAssembly ...
Page 113: ...3 66 Feed and rotary module Feed and rotary module location diagram ApplicationofAssembly ...
Page 127: ...3 80 Needle presser module Needle presser module location diagram ApplicationofAssembly ...
Page 196: ......