BRONKHORST®
9.17.051
MASS-VIEW®
series
Page 3
Short-form Operation Instruction
Before installing the
MASS-VIEW®
it is important to be
sure whether you received the right model using the
packing list and the attached label on the instrument.
Be sure the piping system is clean. For absolute
cleanliness always install filters to assure a moisture and
oil-free gas stream. Install the
MASS-VIEW®
according to
the direction of the flow arrow on the label at the back
of the instrument.
Install the instrument in the line and tighten the fittings
according to the instructions of the supplier of the
fittings.
Be sure the system has no leaks before applying gas
pressure.
Electrical connections must be made with a standard
cable or according to the hook-up diagram in this
manual.
When the instrument is powered up the first time, a
setup menu appears where the pre-installed gas can be
selected, which flow range is to be used and which
communication type.
Use the 4-way button (up and down direction) for
navigation and press the centre of the button to select.
Apply power to the instrument and allow approx. 30
minutes for warm-up and stabilization. This may be done
with or without gas pressure applied to the system.
After entering the default password (which is ‘abc’) in
the security menu, all menus can be enabled or disabled.
Also a new password can be entered and saved.
Perform zero action if needed. See instructions at section
3.6
zeroing procedure
in this manual.
Your instrument is now ready for operation.