page 10
9.17.009
BRONKHORST HIGH-TECH B.V.
2 INSTALLATION
Receipt of equipment:
Check the outside packing for damage incurred during shipment.
Should the packing box be damaged, then the local carrier must be notified at once regarding his liability, if so
required.
At the same time a report should be submitted to Bronkhorst HIGH-TECH B.V. Ruurlo Holland
Remove the envelope containing the packing list; carefully remove the equipment from the packing box. do not
discard spare or replacement parts with the packing material and inspect the contents for damaged or missing
parts.
Return shipment:
When returning material: always describe the problem and if possible the work to be done, in a covering letter.
Important:
Clearly note, on top of package the custom clearance number of Bronkhorst High-Tech B.V. namely:
NL801989978B01
Service:
If this equipment is not properly serviced, serious personal injury and/or damage to the equipment could result. It
is therefore important that servicing is performed by trained and qualified service personnel. Bronkhorst
HIGH-TECH B.V. have a trained staff of servicemen available.
Installation:
By connecting the cable to the 100 ... 240 Vac source, the readout/control unit can operate. The DVM shows
000.0 (only if no external meter or controller has been connected to the housing).
If the LED's of display do not light on, please check fuse in 100 ... 240 Vac connection plug.
Depending on the execution the units can:
1) power external sensors Eurostyle:
+15 Vdc/350 mA
-15 Vdc/50 mA
2) display signals 0 - 5(10) Vdc = 0 - 100.0 % reading
3) power command setpoint signals 0 - 5(10) Vdc to external controller.
Summary of Contents for E-5700 Series
Page 2: ...BRONKHORST HIGH TECH B V ...