background image

I

DETAIL I 

SCALE 1 : 6

6. Assemble supplied terminal blocks,

wire, conduit & junction box cover.

7. Raise one side of heater up into the 

ceiling box & then raise whole heater 

into cavity. 

8. Rotate the heater into horizontal 

position in the ceiling box & then lower 

down onto the ceiling frame.

9. Ensure all four side mounting 

brackets are hooked over

the ceiling frame & centre the heater 

inside the frame.

10. Make electrical connection from 

heater to power supply. 

Connection to be made outsideon the 

side or top of the ceiling box.

www.bromicheating.com

BROMIC HEATING 

Head Office: 

1 Suttor Street, Silverwater, Sydney, NSW 2128 Australia    

Telephone:

 1300 276 642 (within Australia) or +61 2 9748 3900 (from overseas)  

Fax:

 +61 2 9748 4289   

Email:

 [email protected]   

Web:

 www.bromicheating.com 

Note:  Bromic Heating reserves the right to make changes to specifications, parts, components and equipment without prior notification. 

This Installation, operation and service manual may not be reproduced in any form with prior written consent from Bromic Heating. 

V1.0 Last Edited 07/01/2014

Reviews: