I
DETAIL I
SCALE 1 : 6
6. Assemble supplied terminal blocks,
wire, conduit & junction box cover.
7. Raise one side of heater up into the
ceiling box & then raise whole heater
into cavity.
8. Rotate the heater into horizontal
position in the ceiling box & then lower
down onto the ceiling frame.
9. Ensure all four side mounting
brackets are hooked over
the ceiling frame & centre the heater
inside the frame.
10. Make electrical connection from
heater to power supply.
Connection to be made outsideon the
side or top of the ceiling box.
www.bromicheating.com
BROMIC HEATING
Head Office:
1 Suttor Street, Silverwater, Sydney, NSW 2128 Australia
Telephone:
1300 276 642 (within Australia) or +61 2 9748 3900 (from overseas)
Fax:
+61 2 9748 4289
Email:
Web:
www.bromicheating.com
Note: Bromic Heating reserves the right to make changes to specifications, parts, components and equipment without prior notification.
This Installation, operation and service manual may not be reproduced in any form with prior written consent from Bromic Heating.
V1.0 Last Edited 07/01/2014