
B102250-1-0714
Page 10
Do not attempt to cut or alter the flex
tube in any way.
At the access door connect a 3/8" flare
coupling (not supplied by Empire) to the
gas supply line and stainless steel
tubing. Position the tubing in the top
notch of the post. Bend the flex tube at
the top end to match the Feed Line of the
grill valve.
Note: Use pipe thread sealant or Teflon
tape at the threads of each connection
being careful to not allow any of these
materials into the flare seat. Test for gas
leaks as directed by the grill's Owners
Manual
Arrange with your local gas company or
licensed contractor to have a gas supply
line connected to inlet of stainless steel
flex tube assembly.
The gas supply line should be installed
according to local codes to prevent
damage from digging.
CAUTION: The gas supply line must be
regulated (In the case of Natural gas that
means connected after your gas meter and
regulator) and that you have an easily
accessible shut-off valve.
WARNING: Do not SUPPLY LP GAS to a
grill designed for NATURAL GAS or
NATURAL GAS designed for LP GAS.
Patio Post, BL26P or Ss26
posts, skip to page 13.
INSERT FLEX LINE THROUGH
Summary of Contents for IN-GROUND POST BL48G-2
Page 12: ...B102250 1 0714 Page 12 5 16 ATTACH UPPER BRACKET HEX HEAD SCREW SS 10 X 1 2 B101569 4...
Page 17: ...Page 17 BL26P 2 SS26P 2 PATIO BASE PR EM IU M GR ILLS BL26P 2 SS26P 2 PATIO BASE SECTION...
Page 18: ...B102250 1 0714 Page 18 PATIO BASE PARTS DIAGRAM...
Page 28: ...B102250 1 0714 Page 28 GRILL MAINTENANCE HISTORY Date Maintenance Performed...
Page 29: ...B102250 1 0714 Page 29 GRILL MAINTENANCE HISTORY Date Maintenance Performed...
Page 30: ...B102250 1 0714 Page 30 GRILL MAINTENANCE HISTORY Date Maintenance Performed...