3-5
OPERATOR INSPECTION AND TEST
Weekly:
1. Check tire pressure: 120 PSI (827 kPa).
2. Check for loose wheel nuts. (500 foot-pounds (680 N-m) torque required.)
3. Check lights and turn signals.
4. Check power steering lines for damage.
5. Check brake lines for damage.
6. Check operation of horn.
7. Check operation of hoist brake for smoothness.
8. Check outrigger holding valves for operation.
9. Check boom lift holding valve for operation.
10. Check rotation gears for looseness or backlash.
11. Check boom extension cylinder holding valve for operation.
12. Check operation of windshield wipers (if equipped).
13. Boom extension (if equipped) properly pinned with retainers in place.
14. On IC-200-3, check boom chains and chain sheaves.
Summary of Contents for IC-200-2H
Page 6: ...1 2 IC 200 2H DIMENSIONS Courtesy of Crane Market...
Page 7: ...1 3 IC 200 3H DIMENSIONS Courtesy of Crane Market...
Page 8: ...1 4 IC 200 H TURNING DIMENSIONS Courtesy of Crane Market...
Page 18: ...Courtesy of Crane Market...
Page 32: ...2 14 Courtesy of Crane Market...
Page 33: ...2 15 Courtesy of Crane Market...
Page 53: ...3 9 IC 200 LUBRICATION CHART Courtesy of Crane Market...
Page 60: ...3 16 Courtesy of Crane Market...
Page 61: ...3 17 Courtesy of Crane Market...
Page 69: ...3 25 IC 200 3 BOOM CHAIN ADJUSTMENT Courtesy of Crane Market...
Page 74: ...Powered by TCPDF www tcpdf org Courtesy of Crane Market...