Brock IB32-O-A Installation Instructions And Homeowner'S Manual Download Page 16

 

5

PART 2 

OPERATION 

 

 

 

2.1) INITIAL 

START-UP 

 

1.  Turn off the electrical switch which controls the water 

heater (see that proper fuses are installed, max: 15 
amps); 

2.  Fill the water heater (leave inlet water valve open); 

3.  Check carefully for leaks; 

4.  Open manual shut-off valve from the oil tank to the 

burner; 

5.  Adjust the combustion air band or damper to a one-

quarter open position; 

6.  Press the reset button on the combustion safety relay 

ONCE ONLY

 (relay is mounted on burner); 

7.  Turn the electrical switch to "ON" (burner should start); 

8.  The oil line must be purged through the bleeder outlet at 

the pump (see instructions enclosed with the burner); 

9.  Carefully check for oil leaks. 

 

2.2) 

BVSO PERFORMANCE TEST 

 

The purpose of the following test is to check that the 
electrical outlet on the furnace, designated to the BVSO, is 
functional. 

 

1.  Start the burner; 
2.  Remove the three pole plug from the BVSO outlet on 

the furnace; 

3.  The burner must shut-off immediately. 

 

If the test is not in line with the above, call a QUALIFIED 
SERVICE TECHNICIAN. 
 

2.3) ADJUSTMENTS 

 

1.  Adjust the draft regulator to obtain a minimum of -0.02 

W.C. (The draft reading must be taken between the 
water heater flue outlet and the draft regulator); 

2.  Adjust the combustion air band to have a No. 1 smoke 

spot maximum. (Bacharach scale - the combustion 
chamber must be  hot and the access door closed); 

3.  Set the operating and the Limit Control as previously 

specified. 

 
 

NOTE :

 Do not attempt to start the burner when 

excess oil has accumulated, the combustion chamber 
is full of vapour or it is hot. 

CAUTION 

Never burn garbage or paper in the unit and never 
leave paper or rags around it. 
 
 

2.3) SHUT-DOWN 
 

1.  Turn electrical switch "OFF" on the unit circuit; 

2.  Close oil valve at storage tank. 

 

 

NOTE : 

Always keep the fuel supply valve shut off if 

the burner is shut-down for an extended period of 
time.

 

 
 

2.4) FLAME 

FAILURE 

 

1.  Wait at least five minutes for the safety control to 

recycle; 

2.  Check fuses or breakers on the electric circuit; 

3.  Check oil level in the tank and make sure that the oil line 

valve is open (if tank is empty, fill up and purge the oil 
line); 

4.  Make sure that the aquastat is set above water 

temperature; 

5.  Reset the safety control; 

6.  If burner still does not start, call a qualified service 

technician. 

 
 

Summary of Contents for IB32-O-A

Page 1: ...PR S DE L UNIT POUR R F RENCES ULT RIEURES PROPRI TAIRE S V P GARDER CE MANUEL PR S DE L UNIT POUR R F RENCES ULT RIEURES Attention Ne pas alt rer votre unit ou ses contr les Appeler un technicien qu...

Page 2: ...de la maison baisse sous 60 o F 16 o C la possibilit de condensation l int rieur de la chemin e est accrue 1 4 INSTALLATION L installation de l unit doit tre conforme aux normes tablies par les autor...

Page 3: ...d allumage lorsque le thermostat d immersion le demande et d ouvrir le circuit du br leur quand l eau a atteint la temp rature requise En dernier lieu l arr t positif safety du br leur dans les cas s...

Page 4: ...LIFI 2 3 AJUSTEMENTS 1 Ajustez le contr le de tire pour obtenir 0 02 pouce de colonne d eau la lecture doit tre prise entre le collet de sortie du chauffe eau et le contr le de tire 2 Ajustez la bande...

Page 5: ...oc dure 3 3 CHAMBRE DE COMBUSTION La chambre de combustion se constitue en une pi ce de fibre de c ramique Cette chambre est install e avec blocage pour pr venir le d placement de celle ci lors du tra...

Page 6: ...N 4 INFORMATION Mod le Num ro de s rie Date d installation Nos t l service Jour Soir Nom et adresse du distributeur RAPPORT D EXAMEN CO2 Temp rature chemin e Consommation GPH Tire la chemin e Fum e Ex...

Page 7: ...a BRULEUR RIELLO 40 F3 tube insertion 5 5 8 Gicleur Delavan n a 0 65 70A n a 0 65 70A Pression pompe n a 135 n a 135 Ajust air de combustion turbulator damper n a 0 3 5 n a 0 3 5 BRULEUR RIELLO R35 3...

Page 8: ...9 DIAGRAMME LECTRIQUE BR LEUR BECKETT DNS 0242 Rev D...

Page 9: ...DIAGRAMME LECTRIQUE BR LEUR RIELLO DNS 0769 Rev B 10...

Page 10: ...ON 11 B10083 COLLET D INSERTION 12 B10084 PLANCHER 13 B00619 53 ISOLATION 14 B10355 ASS FOYER ET ISOLATION ITEM 13 14 25 INCLUS 15 B10093 CHAMBRE EN REFRACTAIRE 16 G99Z004 RACCORD PLAST x 4 ZINC 17 G9...

Page 11: ...ID LDPE BLANC 14 G99Z019 TUBE TROP PLEIN 3 4 NPT X 42 BMI 08614 15 G11F024 VALVE SURPR 150 3 4x3 4 W 100XL 4 16 B10359 01 ASS PANNEAU DEVANT HAUT 17 R02J008 PUITS IMMER 3 4 NPT PLASTIQ HON 123870B 18...

Page 12: ...SOLATION VIROLE INTERIEURE AVANT 14 B10368 ASS FOYER ET ISOLATION comprend items 16 17 18 27 28 15 B10093 CHAMBRE EN REFRACTAIRE 16 B10304 ISOLATION BAS CABINET 17 B10366 ASS CABINET COTE DROIT 18 G99...

Page 13: ...aution Do not tamper with the unit or its controls Call a qualified service technician INSTALLER SERVICE TECHNICIAN USE THE INFORMATION IN THIS MANUAL FOR THE INSTALLATION AND SERVICING OF THE FURNACE...

Page 14: ...recommended installation practices see the latest CSA code supplements for the installation of oil burner equipment CSA B139 Installation code for oil burning equipment NFPA 31 Installation of oil bu...

Page 15: ...aquastat 1 15 INSTALLING THE OIL BURNER The nozzle is installed in the burner however the nozzle and electrode location must be checked and adjusted as per Table 2 p 8 Mount the burner on the water he...

Page 16: ...2 3 ADJUSTMENTS 1 Adjust the draft regulator to obtain a minimum of 0 02 W C The draft reading must be taken between the water heater flue outlet and the draft regulator 2 Adjust the combustion air b...

Page 17: ...e steps 3 3 COMBUSTION CHAMBER The combustion chamber consists of one piece of ceramic fiber This chamber is securely installed in place before leaving the factory to prevent damage in transit 3 4 BLO...

Page 18: ...7 PART 4 INFORMATION Model Serial number Installation date Service telephone Day Night Dealer name and address START UP TEST REPORT CO2 Flue temp Firing rate GPH Smoke Draft at stack Test performed by...

Page 19: ...ELLO BURNER 40 F3 insertion tube 5 5 8 Nozzle Delavan n a 0 65 70A n a 0 65 70A Pump pressure n a 135 n a 135 Combustion air adjustment turbulator damper n a 0 3 5 n a 0 3 5 RIELLO BURNER R35 3 05 ins...

Page 20: ...9 ELECTRICAL WIRING BECKETT BURNER DNS 0242 Rev D...

Page 21: ...10 ELECTRICAL WIRING RIELLO BURNER DNS 0769 Rev B...

Page 22: ...83 INSERTION COLLAR 12 B10084 FLOOR 13 B00619 53 INSULATION 14 B10355 HEAT CHAMBER AND INSULATION INCL 1 3 1 4 25 15 B10093 REFRACTORY HEAT CHAMBER 16 G99Z004 NIPPLE WITH PLASTIC SLEEVE x 4 ZINC 17 G9...

Page 23: ...G14G007 GASKET 3 3 4 OD 1 ID LDPE WHITE 14 G99Z019 OVERFLOW TUBE 3 4 NPT x 42 15 G11F024 RELIEF VALVE 150 3 4x3 4 W 100XL 4 16 B10359 01 PANEL ASSEMBLY TOP FRONT 17 R02J008 WELL 3 4 NPT PLASTIC HON 12...

Page 24: ...NTERIOR 14 B10368 HEAT CHAMBER AND INSULATION ASSEMBLY includes items 16 17 18 27 28 15 B10093 REFRACTORY HEAT CHAMBER 16 B10304 INSULATION BOTTOM CASING 17 B10366 CASING ASSEMBLY RIGHT SIDE 18 G99Z00...

Reviews: