7. Insert the earth ground wire into the ground terminal on the DC wiring assembly.
NOTE
This equipment installation must meet NEC/CEC Code requirements. Consult local authorities for regulations.
8. Insert the DC power supply wiring assembly with the wires connected into the power supply and tighten the assembly screws.
9. Using the handle on the power supply, hold the power supply level and guide it into the carrier rails on each side of the power
supply slot. Gently push the power supply all the way into the slot, ensuring that it firmly engages with the connector.
FIGURE 22
Installing a DC power supply unit
10. When you are sure the power supply has properly engaged the connector, tighten the chassis attachment screws to secure the
power supply in the slot.
When the device is powered on, the power LED on the device should turn green to confirm that the power supply is correctly installed
and supplying power.
CAUTION
If you do not install a module or a power supply in a slot, you must keep the slot filler panel in place. If you run the chassis
with an uncovered slot, the system will overheat.
Installing an SFP+ transceiver
To monitor the transceivers, the
show media
command output shows the transceiver information for all interfaces on the switch. Third-
party transceivers are allowed. Brocade provides support for third-party transceivers, but may require a Brocade transceiver be used for
troubleshooting.
Support will not be provided if there is an issue with the third-party transceiver.
Complete the following steps to install an SFP+ transceiver.
1. Remove any protector plugs from the transceivers and the ports.
2. Making sure that the bail (wire handle) is in the unlocked position, place the SFP+ transceiver in the correctly oriented position on
the port.
NOTE
The QSFP+ 40 GbE LR4 optical transceiver is supported in ports 1 and 2 only. When the module is inserted into a
stack-unit/slot number/port number combination that is not 1/2/1 or 1/2/2, the following error message displays:
“QSFP LR-4 optics not supported on port
port-number
.”
Installing an SFP+ transceiver
Brocade ICX 6650 Hardware Installation Guide
40
Part Number: 53-1003621-04
Summary of Contents for ICX 6650 series
Page 6: ...Brocade ICX 6650 Hardware Installation Guide 6 Part Number 53 1003621 04 ...
Page 10: ...Brocade ICX 6650 Hardware Installation Guide 10 Part Number 53 1003621 04 ...
Page 12: ...Brocade ICX 6650 Hardware Installation Guide 12 Part Number 53 1003621 04 ...
Page 22: ...Brocade ICX 6650 Hardware Installation Guide 22 Part Number 53 1003621 04 ...
Page 42: ...Brocade ICX 6650 Hardware Installation Guide 42 Part Number 53 1003621 04 ...
Page 56: ...Brocade ICX 6650 Hardware Installation Guide 56 Part Number 53 1003621 04 ...
Page 72: ...Brocade ICX 6650 Hardware Installation Guide 72 Part Number 53 1003621 04 ...
Page 76: ...Brocade ICX 6650 Hardware Installation Guide 76 Part Number 53 1003621 04 ...