
90
Brocade FastIron GS and FastIron GS-STK Hardware Installation Guide
53-1001783-01
Installing or replacing a POE daughter card
8
DRAFT: BROCADE CONFIDENTIAL
Installing a 2-port 10 Gbps module
Follow these procedures and refer to
when installing a 10-Gigabit Ethernet Module:
1. Remove power to the FGS or FGS-STK device. For AC power supplies, turn the switch to the
OFF position. For DC power supplies, turn off the DC power source or disconnect it from the
power supply.
2. If necessary, remove the faceplate for the 2-port 10 Gbps module located in the lower
left-hand corner of the front panel. Use a #2 Phillips-head screwdriver or flathead screwdriver
to loosen the two captive screws that secure it in place. Place the blank faceplate in a safe
place for future use.
3. Remove the new 10-Gigabit Ethernet module and faceplate from its protective packaging.
4. Install the 10-Gigabit module in the device as shown in
•
Properly place and align the 10-Gigabit Ethernet module inside the device.
•
Push the module firmly toward the back of the device until the front panel is flush with the
rest of the device. This action causes the module connector to lock into the backplane
connector.
•
Use a #2 Phillips-head screwdriver or flathead screwdriver to fasten the two captive screws
on the 10-Gigabit module. Affix the screws loosely at first, then tighten them once you are
sure the module is properly positioned.
FIGURE 55
Installing a 2-Port 10 Gbps Module
5. After installing the module, power on the system and verify that the module is working properly.
Installing or replacing a POE daughter card
This section provides instructions for installing or replacing a Power Over Ethernet (POE) daughter
card in the FGS or FGS-STK device.
X4-2XG