XB50L
n
XB80L
n
XB110L Installation Guide
Page 3
1
2
3
4
Parts Bag holds
Knockout Plate
and six (6)
screws
Remove
Instruction
Sheet
Remove CFL Bulbs
from protective packaging
Punch out Mask from
packaging. See Step 6.
New Construction Installation
Tools needed
• Power screwdriver with a Phillips bit
• Phillips screwdriver
• Flathead screwdriver
• Pliers
• Wire insulation stripper
• Wire cutter
Materials needed
• 6" round metal ducting recommended for best performance.
Use of other ducting is acceptable but may impact performance.
• Roof cap or wall cap (built-in damper recommended)
• Tape to seal duct connections
• Electrical wiring and supplies per local code requirements
• 4W (max.) C7-type night light bulb
1
Remove Packaging
2
Install
Mounting
Frame