
Before Installation
Flush through the pipework to ensure
removal of debris. Turn off the mains
water supply and close any isolating
valves.
Important: It is essential when installing
this shower valve full access is made
available for future servicing purposes.
1. Inlet positions
The valve is supplied with the elbows fitted
for the inlet water supplies to be fed from
the bottom. If the water supplies are
required to be fed from the top the elbows
must be switched over. Loosen the
hexagonal screws and swap the elbows
over and tighten the hexagonal screws.
Sufficient 15mm diameter supply pipes
should protrude through the finished wall
surface with 130mm between centres to fit
fully into the shower valve elbows.
2. Attach shower valve to wall
Position the shower valve backplate in the
wall cavity and secure using the fixings
supplied. Push the shower valve into the
backplate and tighten the grub screw.
Note: It may be necessary to secure the
shower valve to a baton if it is being
installed in a stud partition.
Warning: Please check for any
hidden pipes and cables before drilling
holes in the wall.
Once the valve is installed plumb in the
15mm hot and cold water supplies and
Outlet, ensuring the olives are fitted.
Installation
cont.
OP TS1503 CL C (Concealed)
Important: Water supplies to the mixer
must be with hot on the left and cold on
the right when views from the front.
60mm
60mm
130mm
Hot
Cold
Backplate
fixing holes
18
Need help? Give us a call on 0844 701 6273 and speak to one of our trained advisors.