BriskHeat Metal Clad Hopper Heater Instruction Manual Download Page 4

BriskHeat

®

 Corporation.  All rights reserved

 

 

Metal Clad Hopper Heater 

Read and understand this entire manual before operating this electric heater.

 

PRIOR TO INSTALLATION 

1.  Check for suspected damage to the MCH blanket such as rips, punctures, etc. 

2.  Verify surface to be heated is free from all sharp edges, weld splatter, rust, oil, 

etc. Surface must be clean prior to installing heater. 

3.  Check that the desired placement of the blanket will not cause damage to the 

blanket through impact shock, vibration, ambient temperature, or by 
neighboring moving parts. 

4.  Confirm voltage / wattage rating of heater is appropriate for power supply 

device or temperature controller.  The heater is designed to work at a specific 
voltage to heat properly.  For additional information, contact your local 
distributor or BriskHeat

®

.  

5.  Confirm blanket maximum exposure temperature rating is suitable for 

environment. The temperature of the internal heating element may run up to 
25% higher than the external surface of the blanket.  Use extreme caution for 
applications that require a process temperature near the maximum exposure 
temperature ratings of the blanket. 

 

MCH exposure temperature range: -60ºF to 800ºF (-51ºC to 427ºC) 

6.  Confirm all necessary installation hardware and tools are readily available. 

Depending on the application, this may include... 

 

Tools: 

Wire strippers 

Cleaning / prep supplies (varies based on what is being cleaned)

 

Hardware: 

 

Junction Box 

 

Wire Ties 

 

Mounting Hardware 

 

Temperature controller and sensor 

 

Silicone RTV 

 

Insulating material 

 

High-temperature adhesive tape 
(part # AA2180) 

 

Plug if connecting heater to a 
receptacle rather than hard wiring to 
a temperature controller or junction 
box 

BriskHeat

®

 Corporation.  All rights reserved

 

 

Metal Clad Hopper Heater 

MOUNTING

 

(Example shown is for Capacitive Discharge stud welding.  If Acr-welding then ferrule is included along 
with stud.) 

NOTE:

 The Metal Clad Hopper Heating System must be connected to an external control device.  DO NOT 

turn on unless temperature controller is applied. 

1.) Mark Locations of Mounting Holes to surface. Use “System Drawing” to see how 
to place metal clad heaters on the hopper.  The “System Drawing” should be used 
when wiring and placing heaters on unit. 

c.) Completed Stud 

b.) Weld Stud to Hopper Wall 

2.) a.) Insert Stud in Welder 

3.) Ensure surface is clean before placing heater.  Place heater in metal cover slot then attach to 
studs. Install flat washer, ground wire, lock washer, nut, and then install 2nd jam nut to secure heater 
in place. 

Reviews: