1017059
-A
9
ASSEMBLY
================================================================================================
1. Insert the rubber hose (36) that is protruding from
bottom of tank into tee barb (33) through the center
hole in the boom plate (35).
2. Insert rubber hoses (31) into the other end of the
tee barb (33) as shown.
36
33
35
31
31
Assembly Step 4
1. Screw two 5/16”-18 locknuts (23) onto the 5/16 x 2-1/4”
adjustment bolts (37).
2. Attach boom center (35) and right and left boom
extensions (38, 39) to the 5/16 x 2-1/4” adjustment bolts
(37) as shown. Tighten down with two wing nuts (30).
NOTE: The top of the boom extensions should be
17.25" off the ground when installed on the unit to
ensure the spray tips are at the proper application
height.
35
38
37
23
23
39
30
30
Assembly Step 3