1007076 Rev. A
6
3a. Assemble Tie Bars (5) to Frame Angles (4)
using 1/2" x 1-1/2" Bolts (10), 1/2" Lockwashers
(19), and 1/2" Nuts (15).
3b. Assemble Tie Bars (5) to Pull Bar (3) using
1/2" x 2" Bolt (11), 1/2" Lockwasher (19), and 1/2"
Nut (15).
3c. Tighten hardware from Step 2a.
4a. Assemble Spring Shanks (6) to Frame
Angles (4) using 1/2" x 1-1/2" Bolts (10), Special
Spacers (21), 1/2" Lockwashers (19), and 1/2"
Nuts (15).
Ensure Spring Shanks are set to run straight in
the direction of travel.
4b. When assembling for in-between row
cultivation, the extra Spring Shank will be
mounted in the center of the cultivator, using
the same hole and hardware used to fasten Tie
Bars (5) to Pull Bar (3), reference location (A) in
illustration.
Figure 3
Figure 4
FRAME TIE BAR ASSEMBLY
SPRING SHANK ASSEMBLY
ASSEMBLY
15
19
15
19
11
10
4
3
5
(10)
Bolt, 1/2" x 1-1/2"
Qty. 2
(10)
Bolt, 1/2" x 1-1/2"
Qty. 6
(11)
Bolt, 1/2" x 2"
Qty. 1
(19)
Lockwasher, 1/2"
Qty. 3
(19)
Lockwasher, 1/2"
Qty. 6
(15)
Nut, 1/2"
Qty. 3
(15)
Nut, 1/2"
Qty. 6
(21)
Special Spacer
Qty. 6 (or 7)
15
21
6
19
3
10
4
A
5