57-DVRS50N
19
1.
Hang the left and right side back panel onto the bracket in the
back of the firebox. Align with the far outside edge of the brack-
et.
2.
Hang the center back panel onto the bracket and slide the two
outside panels in until they touch the center panel.
Rear Panel Installation Instructions
Side Panel & Baffle Installation Instructions
Set the right and left side
panels by inserting the tabs
into the slot of the support
plate. Panel s should angle
into the firebox (as shown)
Set the baffle on top of the side
panel so the slot in the baffle
sets over the tab on the side
panel.
Small holes to the back
The side panels are secured
thru the side of the firebox
Summary of Contents for 510083
Page 4: ...57 DVRS50N 3 RATING PLATE...
Page 8: ...57 DVRS50N 7 APPLIANCE DIMENSIONS Surround Removed Surround Attached...
Page 27: ...57 DVRS50N 26 LIGHTING INSTRUCTIONS ON RATING PLATE...
Page 31: ...57 DVRS50N 30 REMOTE CONTROL SETUP AND OPERATION cont...
Page 32: ...57 DVRS50N 31 REMOTE CONTROL SETUP AND OPERATION cont...
Page 33: ...57 DVRS50N 32 REMOTE CONTROL SETUP AND OPERATION cont...
Page 35: ...57 DVRS50N 34 REMOTE CONTROL SETUP AND OPERATION cont...
Page 38: ...57 DVRS50N 37 CONVERSION KIT INSTRUCTIONS con t Step 7 Valve Conversion...
Page 40: ...57 DVRS50N 39 WIRING SCHEMATIC Figure 25...
Page 44: ...57 DVRS50N 43 NOTES...
Page 45: ...57 DVRS50N 44 NOTES...
Page 46: ...57 DVRS50N 45 NOTES...
Page 48: ...ARCHGARD INDUSTRIES 7116 Beatty Drive Mission B C V2V 6B4 Canada Website www archgard com...