
Bridgeview Manufacturing Inc
.
FlexCart 48 Header Transport
4
C – Pipe Supports
•
Adjust so that the plastic pad will catch the large pipe running lengthwise on the header. Adjust
side-to-side to be centered between two of the main support ribs. Make sure that the pipe
support is located near to the tie-down location.
•
Ensure that the supports are clear of any structure or mechanism on the underside of the header
•
The header should rest on both the pipe supports and the center skid supports when the flex is
relaxed
D – Ratchet Supports
•
Adjust to align with tie-down points as indicated in the header manual. Make sure the tie down
point is between the header supports, and also located near the outer pipe support.