2
Safety Instructions
⚫
Read all the instructions carefully and keep this manual for future reference.
⚫
Do not use the device if the cord or plug is damaged. It should be replaced before use.
⚫
Do not use an adaptor as the wattage power of this device is high.
⚫
Overloading the electric supply must be avoided.
⚫
As the device requires extra power, do not use extensions if under 13amp. No other products may be connected
to this extension.
⚫
Check the product's rating label and make sure the water urn voltage is fit for your outlet voltage before using.
⚫
The device must be only used as intended. It must be operated in a safe, fault-free condition. Ensure to check
the proper conditions prior to each use.
⚫
This appliance is fitted with a 13amp-16amp plug.
⚫
The appliance is only to be installed in safe locations.
Brewing Preparation
⚫
The device must be positioned on a stable, secure and horizontal support structure prior to use.
⚫
A full vessel contains boiling hot liquids and can weigh up to 80kg. Horizontal positioning is a prerequisite for
transfer pumping during the brewing process. Avoid an unsteady base.
⚫
The device may not be moved during the brewing process. The handles are only meant for transporting the
device in an empty state.
⚫
It is imperative to keep children, frail persons, and animals away from the device while it is in operation.
Remember boiling water is very dangerous.
⚫
Always clean all the parts of your brewing equipment, hygiene is imperative to get good brewing results.
⚫
Before use, it is optional to heat a quantity of hot water in the boiler to use for sterilizing brewing equipment etc.
Over Flow Pipe Assembly
⚫
Attached the telescopic pipe to the lower mesh disc.
⚫
Place the over flow pipe attached to the lower mesh disc into grain basket.
⚫
Adjust the ideal height og the over flow pipe according to the malt volume.
⚫
Place the cap cover onto the pipe when adding the brewing ingredients.
⚫
After adding your ingredients to the basket, remove the cap and slide the upper mesh disc onto the central pipe,
and lower onto the grain, with the 2 posts/handles facing upwards.
⚫
You are now ready to brew.
Program Setting