TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Assembly Instructions
9
1. Locate the Y-Connector power cable and feed it through the
opening for the back panel. (You may need to re-adjust the
Leveler Feet of the base to accommodate the Y-Connector
cable.)
2. Connect each power cable to the supplied Y-Connector cable.
3. Connect the Y-Connector cable to a dedicated 15 A wall outlet.
10
To 15 A wall outlet