![Bretford TechGuard Connect Assembly & Installation Download Page 1](http://html1.mh-extra.com/html/bretford/techguard-connect/techguard-connect_assembly-and-installation_2808411001.webp)
TechGuard
™
Charging Locker 10-Bay
Assembly & Installation
|
The equipment is to be secured to the building structure before
operation.
|
Consult with a structural engineer or suitable professional prior to
installation.
|
Unit must be secured to floor and/or anchored to the wall in compliance with
local building code.
|
Two people required for lifting during assembly.
|
Nothing may be placed on top of assembled unit.
|
The socket-outlet shall be installed near the equipment and shall be easily accessible.
|
Installation Instruction states the product is to be secured to building before operation.
|
Elevated Operating Ambient - Consideration should be given to installing the lockers in an
environment compatible with the maximum ambient temperature Tma of 40°C.
|
Reduced Air Flow - Instructions indicated to not block the ventilation openings so proper air flow
required for safe operation of the equipment is not compromised.
|
Mechanical Loading - Mounting of the equipment in the locker should be such that a hazardous
condition is not achieved due to uneven mechanical loading.
TechGuard Charging Locker 10-Bay 031-10478 Rev 1.0
Tools Required
Estimated Time Required People Required
T-25 Bit
30 Min.
Two (2)
Bubble Level
Powered or Manual Bit Driver
Bit Extension