background image

Page 2 

______________________________________________________________________________

 

Functions     

 

 

 

 

 

 

 

 

 

 

Reach   

 

     

 

 

 

 

 

 

 

 

LED

 

 

 

 

 

 

 

L1 = 100 meter 

 

 

 

L2 = 25 meter

 

 

 

 

 

 

 

 

P1 Programmbutton 

 

 

 

 

 

 

 

 

Connection for switch 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_______________________________________________________________________________

 

Wiring chart 

 

 

 

 

 

 

 

 

 

 

_______________________________________________________________________________

 

Installation motor and rail 

Attach the rail to the wall / ceiling. 

 

 

 

 

 

 

 

 

 

 

Mount the rail not vertical. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

If the motor 

don’t want to click easily, turn the gear wheel a bit and try again. 

_______________________________________________________________________________

 

Step 1   Setting up the first channel 

 

 

 

 

 

1x P1

 

 

 

     

     

2x P2

   

                   

1x 

 

 

 

 

5x LED

   

 

     

 of 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    OR

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

               

 
     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Press 1x on the   

 

Press 2x on the   

Press the close button.   

The LED flashes 5x. 

      Press the close or open button. 

P1 button until the 

 

P2 button.   

 

         

 

 

 

 

 

 

 

      Left or right determines the   

 

LED flashes. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

      direction of rotation. 

 

Reviews: