Page 2
______________________________________________________________________________
Functions
Reach
LED
L1 = 100 meter
L2 = 25 meter
P1 Programmbutton
Connection for switch
_______________________________________________________________________________
Wiring chart
_______________________________________________________________________________
Installation motor and rail
Attach the rail to the wall / ceiling.
Mount the rail not vertical.
If the motor
don’t want to click easily, turn the gear wheel a bit and try again.
_______________________________________________________________________________
Step 1 Setting up the first channel
1x P1
2x P2
1x
5x LED
of
➔
OR
Press 1x on the
Press 2x on the
Press the close button.
The LED flashes 5x.
Press the close or open button.
P1 button until the
P2 button.
Left or right determines the
LED flashes.
direction of rotation.