background image

Field Calibration Instructions

Overview

Brasch Generation 2 sensor boards are calibrated at the factory and have an expected 
calibration duration of approximately two years.  Environmental conditions may shorten or 
prolong this period of time, but once the sensor parameters drift outside of acceptable 
tolerances, the sensor board must be either be recalibrated or replaced.  

This document outlines the procedure for performing field calibration of all Brasch Generation 
2 sensor boards including: 

Carbon Monoxide Models

Nitrogen Dioxide Models

Combination Models

GSE2-CM-24

GSE2-ND-24

GSE2-NCM-24

GSE2-CM-120

GSE2-ND-120

GSE2-NCM-120

GSE2-CM-Remote

GSE2-ND-Remote

GSE2-NCM-Remote

TRNS2-CM-Analog

TRNS2-ND-Analog

TRNS2-NCM-Analog

TRNS2-CM-Digital

TRNS2-ND-Digital

TRNS2-NCM-Digital

GDCP-CM-Remote

GDCP-ND-Remote

GDCP-NCM-Remote

Required:

Voltmeter

Potentiometer Adjustment Tool

100 PPM Carbon Monoxide Test Gas (for CO sensors)

5.0 PPM Nitrogen Dioxide Test Gas (for NO

2

 sensors)

Gas Flow Regulator

Tubing

Calibration Hood

Note:

 All of the above required parts (except a voltmeter) are included with Brasch CO and 

NO

2

 Test Gas Kits.

FG01
Rev 1.2 – January 10, 2022

1

Reviews: