![Brant Radiant Heaters AG2-20-65 Manual Download Page 14](http://html1.mh-extra.com/html/brant-radiant-heaters/ag2-20-65/ag2-20-65_manual_2802214014.webp)
AG2
Series
14
S-Hook and #1
Double-Loop Chain
3
Prepare mounting surface, if necessary weld blocks, drill holes (see figure 3.5).
NOTE:
The burner control box and radiant tubes should be in straight alignment and level.
4
Fasten beam clamp, screw hook or other type of suspension anchor to hanging point.
Attach and close S-hook (P/N: S-HOOK) and #1 double-loop chain (P/N: THCS) to anchor. Check
that it is securely attached.
NOTE:
Threaded rod and turnbuckles may be used.
6
Attach hangers to chains. Adjust chain lengths until radiant tubing is level and equal weight distribution
is achieved. Chains must be straight up and down. Do not install chains at an angle as this can result
in tube warping or separation.
Figure 3.3
•
Mounting the Hangers
3
Wood Beam
3
Concrete Beam
4
Beam Clamp
4
Screw Hook
4
Screw Hook
with Locknut
and Washer
Threaded Rod
and Turnbuckle
6
Threaded Rod
6
Chain
3
I-Beam
4
Beam Clamp
6
Chain
6
Chain
3
I-Beam
5
5
5
3.0
Installation
•
Hanger Placement and Suspension