5.
INSTALL VALVE CONTROL LINKAGE TO THE HANDLE ASSEMBLY WITH COTTER PINS
AND FLAT WASHERS. WITH THE LINK WITH CUT OUT GOING ON THE UPPER MOST
LEVER
6.
CONNECT VALVE LINKAGE TO SPOOL ACTUATORS. MAKE SURE THE FLAT SIDE OF
SPOOL ACTUATOR IS FACING FLAT SIDE UP TO CONNECT VALVE CONTROL LINKAGE.
7.
.
LEVER W/
CUT OUT
TOP LEVER
MAKE SURE THAT
THE FLAT SIDE IS
FACING UP. THE
SPOOL ACUATOR
MAY HAVE TO BE
REMOVE AND
SWAPPED WITH
OTHER VALVE
BODY.