![BrandMotion 1009-6503 Installation Instructions Manual Download Page 5](http://html1.mh-extra.com/html/brandmotion/1009-6503/1009-6503_installation-instructions-manual_2801242005.webp)
INSTALLATION INSTRUCTIONS
6503 Instructions 2-4-14.Doc
Page 5 of 8
30.
Route Chassis Harness around B-pillar trim by lifting
up on the trim and feeding harness through to front.
31.
Continue to route Chassis Harness along the driver’s
side front door opening sill area. NOTE: This will be
a tight fit, as the supplied Chassis Harness will follow
the existing wiring harness.
32.
Reinstall rear sill plate by pressing it back into place
with your hands.
33.
Remove driver’s side kick panel insulation pad
retainers using a Pushpin Removal Tool. Route the
supplied Chassis Harness behind the insulation
(between insulation and metal frame) then reinstall
the insulation).
34.
Reinstall front kick panel/sill plate by pressing it back
into place with your hands.
35.
If needed, install aftermarket display/ Navigation
display per manufacturer’s instructions.
Connect Chassis Harness to Vehicle Wiring
36.
Connect the supplied Chassis Harness Red, Green,
and Black leads as directed in the chart appropriate
for your vehicle below.
Chart A: Vehicles
Equipped with Factory 8.4” Touch Screen
Color Polarity Function
Location
Green
(+)
Reverse
Splice both Green
and Red leads to
pink/yellow wire
in Cavity 19 of
black under dash
Connector I310 M
adjacent to
parking brake
grommet
(Figures 1 & 2)
Red
(+)
Ignition
Black
(–)
Ground
Chassis ground
Figure 1
Figure 2
Connector I 310 M (black)
Use a digital multimeter to test for Ignition
(12v +) signal at pink/yellow wire in Cavity 19.