6
S19-889EXP1A, S19-889EXP1B
Installation
6/7/2017
Bradley •
215-1861 Rev. B; ECN 17-05-004A
S19-304D1 with Options
S19-304C2 with Options
Wiring Diagrams
Page 1: ...1 of 6 6 7 2017 S19 889EXP1A 120V S19 889EXP1B 208 240V Class I Division 1 Indicator Light Explosion Proof NEMA 4X Includes 120V and 208 240V Versions Class II Division 1 and 2 Indicator Light Explosi...
Page 2: ...ify the appropriate ratings prior to installation When making electrical connections be sure to follow all lockout tagout safety procedures CAUTION Emergency equipment must be supplied with tepid wate...
Page 3: ...flushing fluid Bradley plumbed emergency fixtures require a minimum of 30 PSI 0 21MPa flowing pressure Flushing should be tepid per ANSI Z358 1 Weekly activation must be conducted on all plumbed emer...
Page 4: ...osion Proof Indicator Light S19 889EXP1A 120V S19 889EXP1B 208 240V Rated Class I Division 1 Groups C and D and Class II Division 1 and 2 Groups E F and G Black Green Red White Seal Fitting 269 1596 S...
Page 5: ...e mounted directly to the junction box at one of the location shown below B Connect the indicator light to the junction box following the wiring diagram Heat Trace Drench Shower Recommended mounting l...
Page 6: ...6 S19 889EXP1A S19 889EXP1B Installation 6 7 2017 Bradley 215 1861 Rev B ECN 17 05 004A S19 304D1 with Options S19 304C2 with Options Wiring Diagrams...