Bradley S19-240 Installation Download Page 5

Assembly of Components and Parts List

P.O. B

OX 

3

09

MENO

MONE

E FA

LL

S

, WI 5

3

052-0

3

09 U

S

A

TEL: 1-

8

00-B

RADLE

Y    F

AX: (2

62-251-5

8

17)

http://w

ww.b

radle

ycorp

.com

1.2

1.1

1.

3

1.4

1.5

1.6

1.2

2

3

4

7

6

5

8

4.1

2

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

P.O. Box 309, Menomonee Falls, WI 53051

R

TEST THIS UNIT EACH WEEK

Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.

Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden. 

Date
Datum
Date

Signed
Unterschrift
Signe

Date
Date

Date

Signed
Signed
Signed

DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE

Test le fonctionnement des valves chaque semaine et 
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.

1

Figure 2b 

5

Installation

S19-240, S19-240FW

Bradley Corporation • 215-161 Rev. L; EN 06-532E

4/26/07

1

S05-064

1

Eye/Face Wash Assembly

1.1

S05-091P

1

Eyewash Yoke

1.2

S05-135

1

Eye/Face Wash Head

1.3

S53-063

2

Dust Cover

1.4

110-237

1

Tailpiece, Plated

1.5

124-001AF

1

Washer

1.6

153-146

1

Union Adapter

2

169-862

2

90° Street Elbow

3

113-596

1

Pipe Nipple

4

S27-282

1

1/2" IPS Ball Valve with Nut

4.1

110-215

1

Nut Only

5

128-135

1

Handle

6

114-051

1

Safety Sign

7

204-421

1

Emergency Inspection Tag

8

142-002DA

1

Lockwasher

Item

Part No.

Qty

Description

Item

Part No.

Qty

Description

Prepack S45-122 includes Items 4, 4.1, 5, 8
Prepack S45-123 includes Items 4.1, 5, 8

Summary of Contents for S19-240

Page 1: ...ion 215 161 Rev L EN 06 532E 2007 Bradley Corporation Page 1 of 5 4 26 07 S19 240 S19 240FW Unmounted Eyewash and Eye Face Wash Laboratory Application Table of Contents Pre Installation Information 2 Installation Instructions 3 S19 240 Components and Parts List 4 S19 240FW Components and Parts List 5 S19 240 S19 240FW ...

Page 2: ...erify proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this product visit www bradleycorp com or call 1 800 BRADLEY Produc...

Page 3: ...the grip pad and turn the pipe with the wrench NOTE The top of the eyewash heads should be 33 45 838mm 1143mm from the floor Step 2 Connect water supply 1 Connect water supply piping supplied by installer to the 1 2 IPS inlet on the eyewash see Figure 1 2 Open the water supply lines Test for leaks and adequate water flow 3 Mount the safety sign to the wall using sign mounting hardware supplied by ...

Page 4: ...Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y à quelque chose qui ne va pas fait un rapport immédiatement 1 Figure 2a Prepack S45 122 includes Items 4 4 1 5 8 Prepack S45 123 includes Items 4 1 5 8 1 S05 063B 1 Eyewash Assembly 1 1 S05 091 1 E...

Page 5: ...T 1ST WÖCHENTLICH ZU PRÜFEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y à quelque chose qui ne va pas fait un rapport immédiatement 1 Figure 2b 5 Installation S19 240 S19 240FW Bradley Corporation 215 161 Rev L EN 06 532E 4 26 07 1 S05 064 1 Eye Face Wash Assembly 1 1 S05 091P 1 Eyewash Yoke 1 2 S05 135 1 Eye Face Wash Head 1 3 S53 063 2 Dust Cover 1 ...