![Bradley S19-230T Installation Manual Download Page 3](http://html1.mh-extra.com/html/bradley/s19-230t/s19-230t_installation-manual_2800273003.webp)
3
Installation
S19-230T
Bradley •
215-160T Rev. G; ECN 12-05-003C
10/18/2012
Installation Instructions
NOTICE! Avoid cleaners containing organic solvents,
alcohols, and hydrocarbons. Rinse with
water after cleaning.
Flush the water supply line before beginning
installation.
Supplies Required:
•
Pipe sealant
•
Piping to ½" NPT water supply inlet on unit
•
Piping to 1¼" NPT drain outlet for eyewash
•
Sign-mounting hardware
Step 1: Assemble eyewash components
1. Assemble eyewash components as shown on page 4.
•
Apply pipe sealant (supplied by installer) to all
male-threaded pipe joints.
The top of the eyewash heads should be 33"–45"
(838mm–1143mm) from the floor.
Step 2: Connect water supply
1. Connect the water supply piping (supplied by
installer) to the ½" NPT inlet on the eyewash.
2. Connect the tailpiece to the 1¼" NPT drain outlet on
the eyewash.
3. Mount the safety sign to the wall using sign-
mounting hardware (supplied by installer).
4. Open the water supply lines. Test for leaks and
adequate water flow.
29½"
(749mm)
Suggested
Height To
Floor
36"
(914mm)
Suggested
Height To
Floor
15½" (394mm)
8
¹⁄₈
"
(206mm)
5¼"
(133mm)
7½"
(191mm)
Ø 10¾" (273mm)
Figure 1