background image

4

S19-220P

 Installation

10/18/2012 

Bradley • 

215-158P Rev. P; ECN 12-05-003C

Assembly of Components

P.O. Box 309, Menomonee Falls, WI 53051

R

TEST THIS UNIT EACH WEEK

Test-operate valve(s) each week and sign below.

Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt 

durch Unterschrift. Jegliche Störung sofort melden. 

Date
Datum
Date

Signed
Unterschrift
Signe

Date
Date

Date

Signed
Signed
Signed

DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.

ESSAI HEBDOMADAIRE

Test le fonctionnement des valves chaque semaine et 

signe en bas. S'il y à quelque chose qui ne va pas fait  

un rapport immédiatement. 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

13

14

1.7

1.5

1.4

1.3

1.2

1.1

1.9

1.10

1.11

1.12

1.8

1.6

1

7

2

5

3

6

5.1

4

8

9

12

11

10

10.1

10.2

10.3

10.4

 

Items 1.1–1.12 come preassembled as Item 1. 
Items 10.1–10.4 come preassembled as Item 10.

1¼" NPT 

Drain Outlet

½" NPT 

Supply 

Inlet

Flow Control 

This End

Summary of Contents for S19-220P

Page 1: ...72 3539 FAX 262 251 5817 bradleycorp com Installation 215 158P Rev P ECN 12 05 003C 2012 Bradley Page 1 of 5 10 18 2012 S19 220P Wall Mounted Eye Face Wash Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 5 ...

Page 2: ...kly to verify proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this product visit www bradleycorp com or call 1 800 BRADLE...

Page 3: ...ng as a template mark the bolt hole locations on the wall 2 OPTIONAL Install three suitable fasteners supplied by installer for bolts in the wall at the marked hole locations 3 Bolt the inlet drain fitting to the wall or wall fasteners using bolts supplied by installer Step 2 Assemble eye face wash 1 Assemble eye face wash components as shown on page 4 Apply pipe sealant supplied by installer to a...

Page 4: ...te Date Date Signed Signed Signed DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y à quelque chose qui ne va pas fait un rapport immédiatement P O BOX 309 MENOMONEE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 051 13 14 1 7 1 5 1 4 1 3 1 2 1 1 1 9 1 10 1 11 1 12 1 8 1 6 1 7 2...

Page 5: ...Assembly 1 8 107 371 2 Tethered Dust Cover 1 9 269 651 1 Swivel Stem 1 10 124 055 2 Quad Ring 1 11 139 087 1 Spray Ring 1 12 110 199 1 Nut Acorn 2 113 006LQ 1 Pipe x 3 3 169 025 1 Street Elbow 4 128 135 1 Plastic Eyewash Handle Item Part No Qty Description 5 S27 282 1 Ball Valve w Nut 5 1 110 215 1 Nut Only 6 142 002DA 1 Lockwasher 7 269 167 1 Tailpiece 8 113 006AW 1 Close Nipple 9 269 852 1 Reduc...

Reviews: