background image

2

S19-125BF, S19-125FMBF

 

Installation

9/29/08 

Bradley Corporation • 

215-1567 Rev. B; ECN 08-518

IMPORTANT

Read this installation manual completely to ensure proper installation, then file it 
with the owner or maintenance department. Compliance and conformity to drain 
requirements and other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding any packaging material. If any parts are missing, do not begin installation 
until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is 
complete. Test the unit for leaks and adequate water flow. Main water supply to the 
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized 
shutoff.

 The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a 
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI 
Z358.1.

The inspection and testing results of this equipment should be recorded weekly to verify 
proper operation. This equipment should be inspected annually to ensure compliance 
with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be 
trained regarding the placement and proper operation of emergency equipment per ANSI 
Z358.1.

For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY. 

Product warranties and parts information may also be found under ”Products” on our 
web site at www.bradleycorp.com.

Installation

THIS
SIDE

UP

Packing List




P.

O

. B

ox

 3

09

, M

en

om

on

ee

 F

all

s,

 W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Te

st-o

perate v

alv

e(s) ea

ch w

eek an

d sign 

belo

w

.

R

epor

t an

y m

alfunction

s immed

iat

el

y.

Ve

ntil(e) w

öc

hen

tlic

h im 

Te

stbe

trie

b prüf

en,

 b

est

ätigt 

dur

ch U

nter

sc

hrift.

 J

eglic

he S

törun

g s

of

or

t m

elden.

 

Date

Datum

Date

Signed

Unter

sc

hrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

ÄT

 1

S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Te

st le

 fo

nctio

nnem

ent d

es v

alv

es

 c

haque sem

aine et 

sign

e en b

as.

 S

'il y

 à quelqu

e c

ho

se qui n

e v

a p

as fait  

un

 rappor

t im

m

édiatem

ent.

 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Supplies Required:

•  Teflon tape and Pipe sealant
•  Piping to 1” NPT water supply inlet on unit
•  Adequate supply pipe supports
•  Hardware to mount escutcheon to ceiling
•  Minimum 4” (102 mm) drain to accommodate 30 gallons per minute discharge for drench 

shower waste

• Sign-mounting hardware

Summary of Contents for S19-125BF

Page 1: ...ley Corporation Page 1 of 7 9 29 08 S19 125BF S19 125FMBF Barrier Free Recess Mounted Drench Shower Table of Contents Pre Installation Information 2 Assembly of Components 3 Service Parts 3 Cabinet Di...

Page 2: ...with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this...

Page 3: ...andle and Valve Assembly S45 2237 Screw Prepack includes six screws and Torx Power Bit S45 2235 150 212 S19 125BF only Signed Signed Signed Date Date Date Signed Unterschrift Signe Date Datum Date P O...

Page 4: ...dley Corporation 215 1567 Rev B ECN 08 518 S19 125 Series Cabinet Dimensions 12 305mm 14 357mm 15 13 16 402mm 10 254mm 6 1 8 156mm 3 9 16 90mm 2 51mm 1 4 2mm 3 3 4 95mm 3 3 4 95mm 1 3 4 34mm 8 5 16 23...

Page 5: ...x bottom of cabinet to floor S19 125BF S19 125FMBF Ceiling hole 1 3 8 35mm Ceiling hole 5 127mm 30 762mm min to 35 889mm max bottom of cabinet to floor 82 2083mm min to 96 2438mm max to floor Wall ope...

Page 6: ...ley Corporation 215 1567 Rev B ECN 08 518 S19 125BF S19 125FMBF Secure cabinet to wall four places Piping and adequate supports by installer Piping and adequate supports by installer 2 Installation NO...

Page 7: ...125BF S19 125FMBF Bradley Corporation 215 1567 Rev B ECN 08 518 9 29 08 Connect supply piping www bradleycorp com 114 090 To Showerhead 1 NPT Supply Line 3 Connect Water Supply Exploded view of valve...

Reviews: