background image

P.O. Box 309, Menomonee Falls, WI  USA  53052-0309
PHONE 800.BRADLEY (800.272.3539)  FAX 262.251.5817

bradleycorp.com

Installation 

215-1567 Rev. B; ECN 08-518
© 2008 Bradley Corporation
Page 1 of 7 

9/29/08

S19-125BF

S19-125FMBF

Barrier Free Recess-Mounted 
Drench Shower 

Table of Contents

Pre-Installation Information  . . . . . . . . . . . . . . 2
Assembly of Components  . . . . . . . . . . . . . . . 3
Service Parts  . . . . . . . . . . . . . . . . . . . . . . . . . 3
Cabinet Dimensions . . . . . . . . . . . . . . . . . . . . 4
Rough-Ins. . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Installation  . . . . . . . . . . . . . . . . . . . . . . . . . 6–7

PUSH

PUSH

TO

TO

ACTIVATE

ACTIVATE

SHOWER

SHOWER

PUSH

PUSH

TO

TO

ACTIVATE

ACTIVATE

SHOWER

SHOWER

S19-125BF

S19-125FMBF

Summary of Contents for S19-125BF

Page 1: ...ley Corporation Page 1 of 7 9 29 08 S19 125BF S19 125FMBF Barrier Free Recess Mounted Drench Shower Table of Contents Pre Installation Information 2 Assembly of Components 3 Service Parts 3 Cabinet Di...

Page 2: ...with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this...

Page 3: ...andle and Valve Assembly S45 2237 Screw Prepack includes six screws and Torx Power Bit S45 2235 150 212 S19 125BF only Signed Signed Signed Date Date Date Signed Unterschrift Signe Date Datum Date P O...

Page 4: ...dley Corporation 215 1567 Rev B ECN 08 518 S19 125 Series Cabinet Dimensions 12 305mm 14 357mm 15 13 16 402mm 10 254mm 6 1 8 156mm 3 9 16 90mm 2 51mm 1 4 2mm 3 3 4 95mm 3 3 4 95mm 1 3 4 34mm 8 5 16 23...

Page 5: ...x bottom of cabinet to floor S19 125BF S19 125FMBF Ceiling hole 1 3 8 35mm Ceiling hole 5 127mm 30 762mm min to 35 889mm max bottom of cabinet to floor 82 2083mm min to 96 2438mm max to floor Wall ope...

Page 6: ...ley Corporation 215 1567 Rev B ECN 08 518 S19 125BF S19 125FMBF Secure cabinet to wall four places Piping and adequate supports by installer Piping and adequate supports by installer 2 Installation NO...

Page 7: ...125BF S19 125FMBF Bradley Corporation 215 1567 Rev B ECN 08 518 9 29 08 Connect supply piping www bradleycorp com 114 090 To Showerhead 1 NPT Supply Line 3 Connect Water Supply Exploded view of valve...

Reviews: