Bradley S19-120SS Installation Manual Download Page 2

2

S19-120SS

 

Installation

8/11/08 

Bradley Corporation • 

215-279 Rev. G; ECN 08-517

WARNING

Read this installation manual completely to ensure proper installation, then file it 
with the owner or maintenance department. Compliance and conformity to drain 
requirements and other local codes and ordinances is the responsibility  of the installer.

Separate parts from packaging and make sure all parts are accounted for before 
discarding any packaging material. If any parts are missing, do not begin installation 
until you obtain the missing parts.

Flush the water supply lines before beginning installation and after installation is 
complete. Test the unit for leaks and adequate water flow. Main water supply to the 
eyewash should be “ON” at all times. Provisions shall be made to prevent unauthorized 
shutoff.

 The ANSI Z358.1 standard requires an uninterruptible supply of flushing fluid at a 
minimum 30 PSI (0.21 MPa) flowing pressure. Flushing fluid should be tepid per ANSI 
Z358.1.

The inspection and testing results of this equipment should be recorded weekly 
to verify proper operation. This equipment should be inspected annually to ensure 
compliance with ANSI Z358.1.

Workers who may come in contact with potentially hazardous materials should be 
trained regarding the placement and proper operation of emergency equipment per 
ANSI Z358.1.

For questions regarding the operation or installation of this product, visit www.
bradleycorp.com or call 1-800-BRADLEY. 

Product warranties and service parts information may also be found under ”Products” 
on our web site at www.bradleycorp.com.

Installation

THIS
SIDE

UP

Packing List




P.

O

. B

ox

 3

09

, M

en

om

on

ee

 F

all

s,

 W

I 5

30

51

R

TE

S

TH

IS

 U

N

IT

 E

A

C

H

 W

E

E

K

Te

st-o

perate v

alv

e(s) ea

ch w

eek an

d sign 

belo

w

.

R

epor

t an

y m

alfunction

s immed

iat

el

y.

Ve

ntil(e) w

öc

hen

tlic

h im 

Te

stbe

trie

b prüf

en,

 b

est

ätigt 

dur

ch U

nter

sc

hrift.

 J

eglic

he S

törun

g s

of

or

t m

elden.

 

Date

Datum

Date

Signed

Unter

sc

hrift

Signe

Date

Date

Date

Signed

Signed

Signed

D

IE

S

E

S

 G

E

R

ÄT

 1

S

W

Ö

C

H

E

N

TL

IC

H

 Z

U

 P

R

Ü

FE

N

.

E

S

S

A

I H

E

B

D

O

M

A

D

A

IR

E

Te

st le

 fo

nctio

nnem

ent d

es v

alv

es

 c

haque sem

aine et 

sign

e en b

as.

 S

'il y

 à quelqu

e c

ho

se qui n

e v

a p

as fait  

un

 rappor

t im

m

édiatem

ent.

 

P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA

TEL: 1-800-BRADLEY    FAX: (262-251-5817)

http://www.bradleycorp.com

114-051

Summary of Contents for S19-120SS

Page 1: ...e d urgence horizontale acier inox Ducha de alto flujo de suministro horizontal acero inoxidable Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 4 Table des matières Avant l installation 5 Instructions d installation 6 Assemblage des composantes 7 Liste des pièces 7 Contenido Información previa a la instalación 8 Instrucciones de ins...

Page 2: ...peration This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding the placement and proper operation of emergency equipment per ANSI Z358 1 For questions regarding the operation or installation of this product visit www bradleycorp com or call 1 800 BRADLEY Product warranties a...

Page 3: ...own on page 4 Apply pipe sealant to all male threaded pipe joints Bottom edge of showerhead should be 7 0 2134 mm from the floor Step 2 Connect water supply IMPORTANT Do not rely on Bradley s Drench Shower to support supply piping 1 Connect water supply piping to 1 NPT inlet on unit piping supplied by installer Provide adequate supports supplied by installer for supply pipe using pipe hangers or o...

Page 4: ...aine et signe en bas S il y à quelque chose qui ne va pas fait un rapport immédiatement P O BOX 309 MENOMONEE FALLS WI 53052 0309 USA TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com 114 050 4 4 1 7 8 6 5 2 3 1 1 1 21 1 2 1 1 S30 061 1 Stay Open Ball Valve Assembly 1 1 128 142 1 Handle 1 2 S27 276 1 Ball Valve with Jam Nut 1 21 161 079 1 Jam Nut only 2 113 006MN 1 Pipe 1 NPT x 12 Long 3...

Page 5: ...es d inspection Ce matériel doit être inspecté une fois par an pour assurer sa conformité à la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des matières potentiellement dangereuses doivent recevoir une formation sur la mise en place et le bon fonctionnement du matériel d urgence conformément à la norme ANSI Z358 1 Pour toute question concernant le fonctionnement ou l instal...

Page 6: ...ence voir page 7 Mettre de la pâte ou du ruban d étanchéité non fournis sur tous les filetages mâles Le bord inférieur de la pomme de la douche d urgence doit se trouver à 2134 mm 7 ft du sol Étape 2 Raccordement de l alimentation IMPORTANT Ne pas utiliser la douche d urgence Bradley pour supporter la tuyauterie d alimentation 1 Brancher l alimentation en eau sur l orifice d alimentation de 1 in I...

Page 7: ...Description P O Box 309 Menomonee Falls WI 53051 R TEST THIS UNIT EACH WEEK Test operate valve s each week and sign below Report any malfunctions immediately Ventil e wöchentlich im Testbetrieb prüfen bestätigt durch Unterschrift Jegliche Störung sofort melden Date Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN ESSAI HEBDOMADAIRE Tes...

Page 8: ...peccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que puedan tener contacto con materiales potencialmente peligrosos deben recibir capacitación sobre la ubicación y operación adecuada de los equipos de emergencia en conformidad con la norma ANSI Z358 1 Para c...

Page 9: ...ar el sellador de tubería o la cinta adhesiva suministrada por el instalador a todas las juntas de tubería de rosca macho El borde inferior del cabezal rociador debe quedar a 2134 mm 7 pies 0 pulg del suelo Paso 2 Conectar el suministro de agua IMPORTANTE No contar con la ducha Bradley de alto flujo para sostener la tubería de suministro 1 Conectar la tubería de suministro de agua a la entrada IPS...

Page 10: ...Pieza Cant Descripción P O Box 309 Menomonee Falls WI 53051 R TEST THIS UNIT EACH WEEK Test operate valve s each week and sign below Report any malfunctions immediately Ventil e wöchentlich im Testbetrieb prüfen bestätigt durch Unterschrift Jegliche Störung sofort melden Date Datum Date Signed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN ESSAI HEBDO...

Reviews: