Bradley E19-310DC Installation Download Page 3

3

Installation 

E19-310DC

Bradley Corporation • 

215-163DCE Rev. A; ECN 08-512 

9/11/08

Installation

Supplies Required:

•  (3) M10 floor anchors and bolts
•  Teflon tape and pipe sealant
•  Piping to 1-1/4" BSP water supply inlet and 1-1/4"  

BSP drain outlet on unit

•  Adequate supply pipe supports
•  Minimum 102mm (4") drain to accommodate 115 liters 

(30 gallons) per minute discharge for shower waste

•  OPTIONAL: sign-mounting hardware

NOTE: Local codes may require the installation 
of a backfl ow prevention valve to complete proper 
installation. Compliance with local codes is the 
responsibility of the installer. Valve must be tested 
annually to verify that it is functioning properly. Backfl ow 
prevention valves are not included with the fi xture and 
may be supplied by the contractor or purchased from 
Bradley Corporation.

Step 1: Secure base to floor

1.  Install three suitable anchors (supplied by installer) 

for M10 bolts in the floor.

2.  Bolt the base to the floor anchors using M10 bolts 

(supplied by installer).

Step 2: Assemble components

1.  Assemble the remaining unit components as 

shown on page 4.

•  Apply pipe sealant (by installer) to all male-

threaded pipe joints.

•  Use the rubber grip pad provided or a strap 

wrench around pipes when tightening to prevent 
marring. Place the grip pad on the pipe, then 
put the wrench over the grip pad and turn the 
pipe with the wrench.

•  Bottom edge of the showerhead should be 

2159mm (7'-1") from the floor.

Step 3: Connect water supply

IMPORTANT:  Do not rely on Bradley’s 
Combination Unit to support supply piping.

1.  Connect water supply piping to 1-1/4" BSP inlet 

on unit (piping by installer). Provide adequate 
supports (by installer) for supply pipe using pipe 
hangers or other means.

2.  Connect drain piping to 1-1/4" BSP drain outlet on 

unit (piping by installer).

3.  Hang the safety sign from the unit with the curtain 

hooks provided (or mount it to the wall using sign-
mounting hardware by installer).

Top View From Bowl

114mm
(4-1/2")

 

Ø 

78.7mm

(3.1")

NOTE:  All dimensions assume standard thread 
engagement. Variations in manufacturing allow for 
+/- 3mm (1/8") per threaded joint. To fi nd the tolerance 
of a dimension, add the number of thread joints in 
between a dimension and multiply it by 3mm (1/8").

645mm 

(25-3/8")

610mm

(24")

2159mm

(7'-1")

to

Floor

1676mm

(66")

to

Floor

140mm 
(5-1/2")

1041mm 

(41")

152mm

(6")

247mm
(9-3/4")

 

Ø 

273mm

(10-3/4")

267mm 

(10-1/2")

Ø

 229mm (9") Flange 

with (3) 

Ø

 10mm 

(3/8") Holes on 

Ø

 

203mm (8") Bolt Circle

229mm

(9")

Reviews: