![BOX15 T-BENCH +39 Assembly Instructions Download Page 3](http://html1.mh-extra.com/html/box15/t-bench-39/t-bench-39_assembly-instructions_2798164003.webp)
01
3 / 3
MONTAGGIO DEL MECCANISMO
MOUNTING OF THE MECHANISM
G
X4
H
X2
I
X2
K
X2
J
X4
G
X8
SACCHETTO ACCESSORI -
ACCESSORIES
A.
Chiave esa. n.3 -
n 3 Allen key
B.
Chiave esa. n.4 -
n 4 Allen key
C.
Chiave esa. n.5 -
n 5 Allen key
D.
Distanziale per spalla -
Side spacer (x 20)
E.
Bussola M6 -
M6 bush (x 12)
F.
Vite TCB M5x10 ISO 7380 -
M5x10 TCB screw (x 8)
G.
Vite TCCE M6x12 -
M6x12 SHCS screw (x 12)
H.
Vite TPS M6x16 -
M6x16 FHCS screw (x 2)
I.
Vite trilobata M6x25 -
M6x25 self threading screw (x 2)
J.
Vite TPS M6x60 -
M6x60 FHCS screw (x 4)
K.
Perno
- Pin (x 2)
SEQUENZA DI FUNZIONAMENTO
FUNCTIONING SEQUENCE
PER RUOTARE LA GAMBA
TIRARE IL POMELLO NERO
TO ROTATE THE LEG,
PULL THE BLACK KNOB
PER RICHIUDERE LE GUIDE,
SPINGERE LE LEVE ROSSE
(UNA PER CIASCUN LATO)
TO CLOSE THE SLIDES,
PUSH THE RED LEVERS
(ONE FOR EACH SIDE)
PER REGOLARE ALTEZZA DELLA
GAMBA USARE CHIAVE ESA. N.4
TO ADJUST LEG'S HEIGTH
USE N.4 ALLEN KEY
CHIUSO
CLOSED
APERTO
OPENED