©2019 BOWMAN® Manufacturing Company, Inc. All Rights Reserved. Product specifications subject to change without notification. Consumables not included. B
D1020012
TDS
g
BD102-0012 - Installation
Information subject to change without notice. Dimensions are approximate. (Not to scale)
BOWMAN Dispensers
20325 71
st
Ave NE, Suite D, Arlington, WA 98223
800.962.4660 • www.BowmanDispensers.com
To secure base to column, turn column
upside down (with top plate down)
and place base inverted, as shown, on
column.
Use Phillips screwdriver to secure base
to column with (4x) screws (10-32 x
5/16").
Turn stand right side up, so the base is
on the floor.
1
2
3
Assembly Instructions
Cover Your Cough Compliance Kit
BD102-0012
Column Assembly
with Top Plate
Base
Top of
column
Bottom of
column
Base
6
Attach the RS001-0512 Respiratory
Hygiene Station to the column using
(4x) screws included with stand.
Tighten.
To mount the MP-075 Sign Holder,
align the holes of the holder with the
holes of the dispenser. With a flathead
screwdriver, attach using (2x) barrel
screws included with sign holder.
Thumb access to signage goes toward
back of dispenser.
4
5
Top Plate
of column
Parts included:
• Base
• Column
• Respiratory Hygiene Station
• Sign Holder
• Hardware
◦
(8x) 10-32 x 5/16" Phillips head screws
◦
(2x) barrel screws
Tools Required:
• Phillips Screwdriver
• Flathead Screwdriver
Installation
Always mount dispensers securely
prior
to loading with product.