background image

©2019 BOWMAN® Manufacturing Company, Inc. All Rights Reserved. Product specifications subject to change without notification. Consumables not  included. B

D1020012

TDS

g

BD102-0012 - Installation 

Information subject to change without notice. Dimensions are approximate. (Not to scale)

BOWMAN Dispensers

20325 71

st 

Ave NE, Suite D, Arlington, WA 98223

800.962.4660 • www.BowmanDispensers.com

To secure base to column, turn column 

upside down (with top plate down) 

and place base inverted, as shown, on 

column.

Use Phillips screwdriver to secure base 

to column with (4x) screws (10-32 x 

5/16").

Turn stand right side up, so the base is 

on the floor.

1

2

3

Assembly Instructions

Cover Your Cough Compliance Kit

BD102-0012

Column Assembly

with Top Plate

Base

Top of 

column

Bottom of 

column

Base

6

Attach the RS001-0512 Respiratory 

Hygiene Station to the column using 

(4x) screws included with stand. 

Tighten.

To mount the MP-075 Sign Holder, 

align the holes of the holder with the 

holes of the dispenser. With a flathead 

screwdriver, attach using (2x) barrel 

screws included with sign holder.

Thumb access to signage goes toward 

back of dispenser.

4

5

Top Plate 

of column

Parts included:

•  Base
•  Column
•  Respiratory Hygiene Station
•  Sign Holder

•  Hardware

 

(8x) 10-32 x 5/16" Phillips head screws

 

(2x) barrel screws

Tools Required:

•  Phillips Screwdriver

•  Flathead Screwdriver

Installation

Always mount dispensers securely 

prior

 to loading with product.

Reviews: