- 4 -
Figure 1 DUO 4800 Control Panel Layout
Page 1: ...DUO 4800 PACK OPERATING INSTRUCTIONS BW 3010...
Page 2: ...IA THE PROTECTIVE EARTH CONDUCTOR OF THE POWER CORD DO NOT REMOVE THE EQUIPMENT SCREWS OR COVERS NO USER SERVICEABLE PARTS INSIDE DANGEROUS VOLTAGES ARE PRESENT EVEN AFTER SWITCHING OFF THE PACK SHOUL...
Page 3: ...S 7 POWER SUPPLY CONNECTION 7 AC POWER SWITCH 7 CIRCUIT PROTECTION 7 FAST SLOW CHARGE SWITCH 8 FLASH HEADS 8 FLASH POWER SELECTION INDICATION 8 MODELLING LAMP OUTPUT CONTROL 9 OPEN FLASH 9 EXTERNAL SY...
Page 4: ...4 Figure 1 DUO 4800 Control Panel Layout...
Page 5: ...visible READY Indicator 9 Channel A Modelling LAMP Power Variator 10 Channel B Modelling LAMP Power Variator 11 Channel A Modelling LAMP Switch CONTINUOUS OFF INTERMITTENT 12 Channel B Modelling LAMP...
Page 6: ...he equipment with damaged cables Have them replaced as soon as possible NEVER attempt to repair them yourself z NEVER use the Pack or Flash Heads in an environment where moisture water vapour or infla...
Page 7: ...rotection which protects the unit in the event of extended periods of continuous flashing and also in the unlikely event of failure of the cooling fan z EMC Electro Magnetic Compatibility filters fitt...
Page 8: ...be used 3 It is only possible to use a single 3k QUAD head in socket B on the 4800 pack as the pack will not charge when a single 3k QUAD head is plugged into socket A z For detailed information on th...
Page 9: ...Channel B switches and variators have independent control over the Modelling Lamp in their respective Channel z Set the appropriate Modelling Lamp switch to the centre position to switch the Modellin...
Page 10: ...the SOUNDER switch to ON to enable the Sounder The Red indicator LED below the switch will be lit when the Sounder is in operation When the Sounder is switched ON it will give a short beep when the Pa...
Page 11: ...eriod Pack NOT READY AC Power Switch neon AND one or more other indicators on the control panel are lit and the top panel Circuit Breaker has operated Pack previously under very heavy use with fast re...
Page 12: ...Duo Lite Head BW 3015 4800Ws 1 Head 600Ws 1 Head 4800Ws 2 Heads 300Ws 2 Heads 1 322 second 1 243 second 1 555 second 1 417 second SUPPLY VOLTAGE 200 to 253 Volts 50Hz FLASH VOLTAGE STABILISATION 1 RE...
Page 13: ...include a full range of Stands Umbrellas Reflectors and Register Wafers etc For details of all related products please contact your local distributor Due to our policy of constant product improvement...
Page 14: ...FITTED SOCKET 1 SOCKET 2 1 4800W s 1 2400W s 2 2400W s 2400W s ISOLATE MODE The TOTAL flash output is split asymmetrically between the two Channels dependent upon the POWER switch VARIATOR A and VARI...
Page 15: ...15 DUO 4800 INSTRUCTIONS BWL 0277 Issue 1 5 5 99 BOWENS INTERNATIONAL LIMITED 355 OLD ROAD CLACTON ON SEA ESSEX C015 3RH ENGLAND Tel 44 0 1255 422807 Fax 44 0 1255 436342...